Super-sized cooling
About 1 km of Weholite pipes were installed in Philippines as cooling water intake and outfall pipelines for the Petron Bataan Refinery (PBR). The Project Service team at Uponor Infra offered a turnkey solutions for the project.
About 1 km of Weholite pipes were installed in Philippines as cooling water intake and outfall pipelines for the Petron Bataan Refinery (PBR). The Project Service team at Uponor Infra offered a turnkey solutions for the project.
In addition to pulp, the Äänekoski factory produces bio-products such as pine oil, turpentine and biogas. Metsä Group has invested 1.2 billion euros in the new factory, which is the largest investment in the history of Finland’s forestry industry. Uponor Infra delivered most of the project’s municipal infrastructure – the water, sewage and storm water pipes, the wells, and their parts. The deliveries also included an over one-kilometre-long Weholite outfall pipe for cooling water.
A new Weholite pump station – one of the largest high-density polyethylene pump stations in North America – meets the existing increase and future sanitary sewer demands in the Montgomery Borough of Pennsylvania, United States.
A U.S. irrigation district with a rich agricultural history has chosen Weholite to ensure that the district’s valuable water supply will conserve every ounce of water intended for use and remain safe and leak-free.
Uponor was proud for the chance to contribute to such a worthy initiative – a facility dedicated to the care of sick children. Uponor specialists made a point of actively participating early on in the need-assessment and design phases of the project. Their contributions included a range of much-valued municipal engineering and building technology solutions.
The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
In 2021, a renovation of a corroded sewage collector was carried out in Swarzewo using a tight-fitting method.