Referencja

Faroe Island tunnel with Uponor pipe system, Denmark

Under the sea, safety comes first

Fakty o projekcie:

Denmark
Infrastruktura transportowa
Odwodnienia, Kanalizacja deszczowa
Realizacja: 2020

Zaangażowanie Uponor

10 km pressure pipes and tanks
Pressure pipes and tanks

An underlying network of pipe and pump systems keeps the tunnel free of water and safe for motorists

The Faroe Islands consists of 18 islands in the North Atlantic Ocean, about halfway between Norway and Iceland. The construction of road tunnels through the steep mountains of the islands began in the 1960s. The archipelago now hosts a total of 19 tunnels.

When the country’s longest undersea tunnel, the Eysturoy Tunnel, was finished in December 2020, islanders could cut almost 50 minutes off their trip from the capital, Tórshavn, to the towns of Runavík and Strendur, which can now be reached by road in just 15 minutes.

The tunnel is impressive 11.2 kilometres long, and links the two most populated islands, Streymoy and Eysturoy. At its deepest, the tunnel runs 189 metres below sea level. The tunnel is hugely popular with the island nation’s residents, who can now also boast the world’s first ever undersea roundabout.

Safety hidden beneath the roadway
As motorists drive into the tunnel, they come into a stylish entrance of harmonic arches, and then to a roundabout flooded with light. Here travellers can experience the local artist Tróndur Patursson’s multicoloured light show with an 80-metre sculpture that reaches around the roundabout. The steel ring illustrates people dancing the traditional Faroese dance.

Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that rain and surface water are kept away from the roadway and technical installations, so that motorists can enjoy the tunnel’s aesthetics safely and securely. Gravity leads water into drains and pipes and down to the tunnel’s lowest point. Here, large 16 bar pumps send the water back to the surface and out into Skálafjørður fjord.

The system operates with 160-metre water columns and pumps out between 1,200 and 1,500 litres of water a minute. However, it is built to deal with four times this amount, keeping the tunnel safe for motorists at all times. The largest ever infrastructure project The pressure pipes, tanks and ten kilometres of pipework for the project were supplied by Uponor, which has delivered plastic pipe solutions for several earlier tunnel projects on the Faroe Islands – each time in partnership with Faroese company KJ Hydraulik. And there’s a reason for this, according to Jonn Sólheim Thomsen, Sales Engineer at KJ Hydraulik. “We have been working with Uponor for over 15 years. As there are such strict safety requirements on a project like this, Uponor’s expertise and knowledge of their products’ strengths and weaknesses have been absolutely crucial. This was a major reason why we chose to work with them again,” says Jonn Sólheim Thomsen. “Plastic is a very strong material with a guaranteed service life of over 100 years, and it’s also far easier to handle and install than equivalent pipe systems in other materials.”

The Eysturoy Tunnel is the third undersea tunnel in the Faroes. It´s the largest ever infrastructure project in the Faroe Islands and it took almost four years to complete. The tunnel opened for traffic on 19 December 2020.

Uponor has previously supplied similar rain and wastewater systems for projects including the Øresund Fixed Link and the Great Belt Fixed Link.

Faroe Island tunnel solution

Faroe Island tunnel solution 1

Informacje o projekcie

Informacje o projekcie

Kraj
Denmark
Realizacja
2020
Rodzaj budynku
Infrastruktura transportowa
Linia produktu
Rury PE do renowacji rurociągów grawitacyjnych

Podobne projekty

Kanalizacja deszczowa dworca kolejowego

Kanalizacja deszczowa dworca kolejowego

Specyfika budowy kanalizacji deszczowej w ramach inwestycji kolejowych polega na tym, że musi być ona odporna m.in. na dynamiczne obciążenia pochodzące od przejeżdżających pociągów. W przypadku stacji w Koninie ważnym elementem układu kanalizacji deszczowej są zbiorniki retencyjne.
Zbiorniki retencyjne w terenach górskich

Zbiorniki retencyjne w terenach górskich

Budowa drogi ekspresowej S1 na odcinku Przybędza-Milówka, nazywanym obejściem Węgierskiej Górki. Do odwodnienia układu drogowego wybrano charakteryzujące się doskonałymi właściwościami zbiorniki polietylenowe Uponor Infra.
Zbiorniki retencyjne dla terminala multimodalnego

Zbiorniki retencyjne dla terminala multimodalnego

W Zduńskiej Woli - Karsznicach powstaje właśnie jeden z największych w Polsce terminali multimodalnych.  Najważniejszymi elementami układu zagospodarowującego wody deszczowe tego terminala będzie bateria dwóch zbiorników retencyjnych Uponor Infra.
Modernizacja śluzy na stopniu wodnym

Modernizacja śluzy na stopniu wodnym

Na stopniu wodnym Krapkowice trwa modernizacja śluzy i sterowni oraz przebudowa awanportów. Uponor Infra dostarczyła na tą budowę rury polietylenowe Weholite DN2000 SN8 a także studzienki, łuki segmentowe i kształtki specjalne.
 
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.