Sustainable sewer pipeline with Ultra Rib 2 Blue
Kommunal mark

Sustainable sewer pipeline with Ultra Rib 2 Blue

The Ultra Rib 2 Blue pipes were first launched in Sweden – this year, the pipes have already been installed at several locations. In Finland, a pilot installation was carried out in early autumn in the Jalkaranta district of Lahti, a few kilometres from the city centre.

Weholite yields savings and smoother implementation
Industrimark

Weholite yields savings and smoother implementation

New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.

Water treatment plant
Kommunal mark

Water treatment plant

Water company Ylä-Savon Vesi Oy needed a solution to improve the water quality in water supply process. The solution was an aeration tank made of Weholite.

Urban runoff under control – quickly and easily
Kommunal mark

Urban runoff under control – quickly and easily

Nastola's plans initially featured a pipeline but this was replaced with a runoff tunnel. Thanks to the quick and easy installation, the time originally set aside for the project could be halved.

Uponor's head office is a model example of energy efficiency
Kontor

Uponor's head office is a model example of energy efficiency

The indoor air of Uponor's two-storey head office in Vantaa is produced by an energy-efficient heating and cooling system.

Uponor's brand-new technology for a wavelike log house
Enfamiljshus

Uponor's brand-new technology for a wavelike log house

The wavelike house presented at Mikkeli Housing Fair is an exclusive log house on the shores of Lake Saimaa designed by architect Seppo Mäntylä. The floor area of the laminated log house is 268.5 m2.

Underfloor cooling adds value to new construction
Flervåningshus

Underfloor cooling adds value to new construction

Postitalo, the former post office building in downtown Tampere, got a new look in 2017 when it was renovated into new commercial premises and a block of flats was built on top. The heat distribution system of choice was Uponor's underfloor heating and cooling system, which was installed in all flats.

Väg & Järnväg

The snow melting is becoming more efficient in Helsinki-Vantaa airport

In the non-Schengen terminal  in Helsinki-Vantaa airport is being built new standing place for the airplanes. In the concrete base was installed Uponor's snow melting system. The system is heated by district heating. The unique system has provided great experiences.

The service flue solution speeded up the construction of a block of flats in Lahti
Flervåningshus

The service flue solution speeded up the construction of a block of flats in Lahti

Two seven-storey blocks of flats were completed in the Mukkula district in Lahti in late autumn 2015. Service flues were installed in a total of 108 flats at Asunto Oy Lahden Timonkadun Helmi on Timonkatu.

The plumbing in order in one go
Enfamiljshus

The plumbing in order in one go

Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.

The plumbing in order in a single day
Enfamiljshus

The plumbing in order in a single day

The 30 years old copper plumbing of the house were replaced with a Uponor composite system. The renovation was over in one day. The contractor for the job was LVI-Dalton Ltd from Klaukkala, Finland.

The joint renovation project in Maunula – cost savings through co-operation
Flervåningshus

The joint renovation project in Maunula – cost savings through co-operation

In the Maunula district of Helsinki, an exquisite joint renovation project is under way. The project, begun in 2012, involves six housing companies. The modernisation of the building technology is being implemented with elements from the Uponor Cefo line, for renovation of water, sewer, and ventilation systems, coming to 1,350 elements in total.