Заповніть кошик BIM з каталогу продуктів

561 результатів пошуку
Uponor filter chamber part of the stormwater study
Комунальні об'єкти

Uponor filter chamber part of the stormwater study

In recent years, stormwater quality management has become an increasingly important part of urban stormwater strategies. A pilot project was launched in Heinola to clean stormwater with innovative filter chambers developed by Uponor. At the same time, valuable research data will be collected on stormwater quality from two different types of areas and on the treatment results achieved with filter chambers.

Uponor Vortex stormwater solution
Комунальні об'єкти

Uponor Vortex stormwater solution

The City of Espoo is the first in Finland to introduce the Vortex stormwater separation chamber. It can be used to efficiently separate floating and descending solids from stormwater. The aim is to reduce the maintenance costs of the retention system built from stormwater tunnels and prevent solids from ending up in waterbodies.

Hybrid solutions for storm water management
Комунальні об'єкти

Hybrid solutions for storm water management

City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.

Now that’s truly FAST
Комунальні об'єкти

Now that’s truly FAST

Uponor IQ stormwater solution was installed in the Rakokivi's new community centre in Nastola, Lahti, so quickly that it surprised everyone involved.

Uponor expertise supports state-of-the-art children’s hospital
Заклади охорони здоров'я

Uponor expertise supports state-of-the-art children’s hospital

Uponor was proud for the chance to contribute to such a worthy initiative – a facility dedicated to the care of sick children. Uponor specialists made a point of actively participating early on in the need-assessment and design phases of the project. Their contributions included a range of much-valued municipal engineering and building technology solutions.

Ease of installation is key
Транспортні вузли

Ease of installation is key

Weholite pipes are light and easy to install. They really come into their own in a project in the harbour of Auckland, the largest city in New Zealand – the extension of an old stormwater line using massivepipes with an internal diameter of 3–3.5 metres. In this busy harbour area, it is not possible to carry outlarge-scale excavation work. The soil of the region and strong tides pose their own challenges.

FishGLOBE revolutionises the future of plastic structures for marine conditions
Будівлі промислового призначення

FishGLOBE revolutionises the future of plastic structures for marine conditions

As tall as an apartment building. A diameter of 22 metres. A volume of 3,500 cubic metres. FishGLOBE V5, a fish farming facility built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, is the world’s largest PE plastic structure designed for marine conditions.

Тренувальне поле для ФК «Шахтар»
Спортивні комплекси

Тренувальне поле для ФК «Шахтар»

Інвестиції у комфорт за будь-якої погоди.

Ice-rink in Pesterzsébet
Спортивні комплекси

Ice-rink in Pesterzsébet

The facility is located in district XX. of Budapest, at Zodony street 1., in the area near the Gubacsi bridge and the Helsinki road, in the vicinity of the Gubacsi residential block and the Mediterrán subdivision.

Thermal Bath in Egerszalók
Спортивні комплекси

Thermal Bath in Egerszalók

The real sight of Egerszalók is the thermal well springing in the Southern part of the village, and the travertine hill created by the running water, which became known as the "salt-hill" over the years.

Hanspaulka Villa
Приватні будинки

Hanspaulka Villa

A newly built single-family home equipped with underfloor heating and ceiling cooling.

Ericusspitze Spiegelhaus
Офісні будівлі

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.