Uponor
Case study

Elementary school in Poznan, Poznań, Poland

Elementary school in Poznan

Project Facts

Poznań, Poland
公共建筑
Local Heat Distribution, 铝塑管水暖系统
Completion: 2011

Uponor Involvement

8669

This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011 by contractor PTB Nickel. Up to 800 students can attend  these schools. The project was made up of two parts, the educational and sports. In this block of buildings there were applied innovative architectural and technological solutions, which will be followed in the list of objects of the XXI century. Primary and secondary school in Poznan contains 41 classrooms, specialist rooms including: chemical, art classes, music, computer and audio-visual room. Part of the investment is sports: sports hall with seats for 400 spectators, gym, corrective gymnastics hall, playing fields for football, basketball and volleyball, sports track with a length of 60 m, the hill in the distance and a playground for the youngest.


For the tap water and central heating system in the school buildings there were used Uponor multilayer pipes with diameters from 16 to 63 mm. Moreover Ecoflex system with Uponor Thermo and Aqua pipes were lied, because of their flexibility and the low weight, as well as possibility of problem-free laying around corners and obstacles.


Poznanski educational complex in numbers:


- 4,356.33 m2 - built-up area


- 8,668.89 m2 - school floor area


- 41 class rooms with a total area 2,303.30 m2


- 440 m2 - inclusive playground-370 m2


- Multi-purpose field with tartan surface-2280 m2


- Grass field with synthetic-470 m2 - with tartan surface track - 1.3 ha


- The surface area-1306 m2 - sports hall with stands for 400 seats-246 m2


- Multimedia hall with 300 seats
 

Elementary school in Poznan

0002819

Project Information

Project Information

Address
Hezjoda 15
Country
Poland
Completion
2011
Project Type
New building
Building Type
公共建筑

Similar projects

上海世博会2010-芬兰国家馆

上海世博会2010-芬兰国家馆

芬兰馆—“冰壶”营造了一种“美好生活”的愿景,自由、创造、创新、社区精神、健康与自然。这些美好元素的完美融合,为人们提供了一个探讨美好生活发展蓝图的平台。另外,“冰壶”是按照永久性建筑的标准来设计的。世博会后,“冰壶”可被方便地拆卸,然后异地重建,后续利用。
北京园博会主展馆

北京园博会主展馆

北京园博会主展馆占地3.2公顷,建筑面积5万平方米。作为园博园核心区的主建筑,主要用于展示国内外造园艺术以及园林绿化新技术、新材料、新成果,展示奇石、插花、盆景等各类园林艺术作品。展会期间是组织高层论坛、学术研讨、技术与商贸交流、特色文化艺术展示、展演等系列活动的主场地,同时承担园博会的室内展览中心、会议中心、新闻中心、接待服务中心等功能。
KULMER's castle

KULMER's castle

A replica of Kulmer’s castle was constructed based on a project designed by a renowned Zagreb architect Branko Kincl.
Tailored renovation solution

Tailored renovation solution

The Vierimaantie road, located close to the town centre of Ylivieska, Finland has a concrete sewer line constructed in the 1960s and 1970s. A decision was taken to renovate this sewer using a tailored solution, and the product developed for this purpose is now also available to other customers.
European Hospital of Marseille

European Hospital of Marseille

The European Hospital is structured around poles of excellence that already made the reputation of Ambroise Paré and Paul Paré Desbief institutions. His care offer is completed by a modern and comprehensive technical platform.
American School

American School

“Move!” We are convinced, that sports, primarily mass sports and leisure time sports, have an emphasised role in Hungary today – both from a pedagogical and a medical point of view.
National Theatre

National Theatre

The building of the Hungarian National Theatre is one of the most famous and most modern buildings of the city. The theatre is on the banks of river Danube.
Gardens by the Bay, Singapore

Gardens by the Bay, Singapore

Gardens by the Bay comprises two glass-domed conservatories and one waterfront garden in the heart of Singapore, around the Marina Channel. Uponor is proud to supply its radiant cooling solution to this premier tropical garden city.
Makkah Royal Clock Hotel Tower

Makkah Royal Clock Hotel Tower

Uponor cooling and MLC plumbing solutions are being used in one of the most exciting projects in the Islamic holy city of Mecca in the Kingdom in Saudi Arabia.
Cathedral Dome of Atri, Italy

Cathedral Dome of Atri, Italy

In the course of several centuries, Atri has always been an important city both for civil and religious aspects. Uponor underfloor heating was installed.
Meander

Meander

Large, modern and fitted with the latest in air conditioning technologies. In 2012, construction work got underway on a new world class hospital on Maatweg in the Dutch city of Amersfoort. The building has since been handed over, and patients can now be better accommodated than at the old sites in Amersfoort.
EMT: Bus depot, Madrid

EMT: Bus depot, Madrid

The Empresa Municipal de Transportes de Madrid, SA (EMT) installs Uponor´s Invisible Air- Conditioning system in the newly renovated bus parking facility.
Umwelt Arena

Umwelt Arena

Opening in 2012, the Environmental Arena offers business and organisations from the environmental sector the largest and most spectacular platform for promoting environmental issues and energy efficiency.
IKEA

IKEA

The IKEA homestore in Rothenburg in the Canton of Lucerne, uses the TABS Thermally Active Building System from Uponor to cater for heating and cooling requirements.

Inselspital

Inselspital

The intensive care, emergency medicine and surgery centre of the Inselspital hospital in Bern, known as the INO, is efficiently heated and cooled using Uponor Contec Single.

Muottas Muragl

Muottas Muragl

Muottas Muragl is a popular mountain vantage point in St. Moritz. Work began on the refurbishment of the mountain resort hotel in 2010. Uponor supplied the radiant heating/cooling system for the project.
Tom Mutters School

Tom Mutters School

For the Tom Mutters School renovation, Uponor Minitec and Knauf Levelling Screed 425 were used to achieve a low profile, despite having to add levelling.
Abbey of Praglia

Abbey of Praglia

Selected for maximum flessibility and durability, Uponor's preinsulated pipes connect the wood chip boiler to the pump unit located within the abbey perimeter.