Naplňte nákupní košík BIM z katalogu produktů

Reference

399 Nalezené výsledky
Cultural institutions

Cartuja Qanat

Disruptive urban transformation through water and Uponor's Thermatop M solution. 

Průmyslové budovy

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
Veřejné budovy

National Theatre

The building of the Hungarian National Theatre is one of the most famous and most modern buildings of the city. The theatre is on the banks of river Danube.

Sportovní zařízení (venkovní/vnitřní)

NK Zagreb's Training camp ZAGREBello

NK Zagreb's Training camp ZAGREBello is the most up-to-date sports centre in Croatia.

Sportovní zařízení (venkovní/vnitřní)

Dudley College, Dudley

 The Advance II project is part of a transformation programme at Dudley College and the fifth new teaching facility to be constructed as part of the ‘Dudley Learning Quarter’ campus development.
Sportovní zařízení (venkovní/vnitřní)

Maksimir stadium, Zagreb

After the renovation, the field at Maksimir stadium in Zagreb, Croatia is now equipped with Uponor Meltaway, a snow and ice melting system.

Sportovní zařízení (venkovní/vnitřní)

Stavanger Concert Hall

The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.

Viacpodlažné budovy

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.

Viacpodlažné budovy

South Kilburn residential site

Connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.

Kancelářské budovy

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.

Kancelářské budovy

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.