Warm feet for 9,600 chicks, Weitersfelden, Austria

Warm feet for 9,600 chicks

A modern chicken coop needs panel heating - the Kaltenberger farming family is convinced of this. They equipped their new organic pre-fattening house in Weitersfelden, Austria, with Uponor systems.

Project Facts

Weitersfelden, Austria
Industrial
Radiant Heating & Cooling, Multilayer Pipe Systems
Completion: 2020

Uponor Involvement

400 sqm industrial heating Uponor Magna - heating manifold Uponor Vario PLUS
80 m pipe system Uponor Ecoflex Thermo Twin
Uponor Uni Pipe PLUS multi-layer pipe with the S-Press PLUS fitting system

After farmer Wolfgang Kaltenberger and his wife Katharina took over their parents' farm in Weitersfelden in 2016 and built their first chicken coop in 2017, the second construction project for the family now followed.
In mid-April 2020, the earthworks for the pre-fattening house began. Since late summer 2020, up to 9,600 chicks have been growing up in the new building before they later move into the chicken coop. To ensure that the animals have ideal conditions and the farm can operate efficiently, the Kaltenberger family opted for systems from Uponor, first and foremost a concrete-integrated panel heating system.

Animal welfare and time saving

 "We have already had good experience with a panel heating system integrated into the floor slab in the existing chicken coop," says Wolfgang Kaltenberger. One of the main advantages of panel heating is animal health: with panel heating, the required temperatures can be achieved much more precisely than with conventional fan heaters. In addition, warm feet prevent foot diseases, to which poultry are very susceptible. On the other hand, the farm benefits from the fact that the bedded straw on the floor always remains dry and does not have to be replaced as often. "This saves us a lot of work," emphasizes the farmer.

Special heating system for industrial areas

 When it came to selecting the product for the floor heating. The pipes are laid at intervals of 15 centimeters over 400 square meters of barn area, which adds up to 2,700 linear meters. Two Uponor Vario PLUS heating manifolds, each with eight heating circuits, provide even heat. Thanks to the modular design, these distributors made of fiber-reinforced plastic can be adapted to a wide range of installation conditions and can be installed quickly with virtually no tools. Uponor technology is also present in new buildings beyond floor heating. An 80 meter long Uponor Ecoflex Thermo Twin pipe connects the underfloor heating with the heat generator, i.e. the wood chip heating in the machine hall. It combines the supply and return lines in one pipe.

From planning to implementation

Last but not least, the drinking water is also transported by Uponor systems; this task is performed by multi-layer pipes Uponor Uni Pipe PLUS with the S-Press PLUS fitting system. "Chickens are one of the few animals that require water of drinking quality, and with Uponor I know that I can rely one hundred percent on its hygienic provision," explains the client. The same type of pipes is used for the drinking water installation in the technical room. In the summer of 2020, the time had come: With the commissioning of the pre-fattening barn, the family was able to open a new chapter in the history of their organic farm.

Warm feet for 9,600 chicks

uponor huehnerstall image gallery 1 desktop

Project Information

Project Information

Address
4272 Weitersfelden
Country
Austria
Completion
2020
Project Type
New building
Building Type
Industrial
Product lines
Uponor Vario PLUS, Ecoflex Thermo, Magna

Partners

Partners

Building owner:
Katharina und Wolfgang Kaltenberger

Planner: 
Hörmann GmbH & Co. KG, St. Peter/Au
https://hoermann-info.com

Similar projects

Uponor Annex

Uponor Annex

See how our commitment to lean manufacturing, energy efficiency, and providing a superior work environment is showcased in our new...
Plastic pipe withstands mill’s process water

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.
Leica Camera AG Headquarters

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
Bangkok Airport

Bangkok Airport

An Uponor panel cooling system will cool Bangkok's new international airport in combination with a displacement ventilation system.
Chatterley Valley

Chatterley Valley

The world's first BREEAM outstanding rated logistics building has been equipped with industrial floor heating from Velta UK.
Manitoba Hydro Place

Manitoba Hydro Place

See how Uponor hePEX is being used to heat an 18-floor building in a location where temperatures can dip below 0°F...
Northstar Railway

Northstar Railway

See how Northstar's commuter rail platform was made safer with Uponor's snowmelt system. Combatting winter ice required...
Regional Perinatal Center

Regional Perinatal Center

National Project "New Life - New Quality of Maternity and Childhood " implements the State Agency for Investment and National Projects . The project is implemented on the initiative of the President of Ukraine Viktor Yanukovych and implemented by the Ministry of Health of Ukraine , National Academy of Sciences of Ukraine , local government and the All-Ukrainian Charitable Organization " Victor Pinchuk Foundation - a social initiative ." He planned to create a national network of perinatal centers of medical institutions III level . Advanced equipment , high level of medical training doctors Obstetricians and neonatologists can significantly reduce maternal , infant mortality and disability.
eMAG Warehouse

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.