Case study

Panorama 2962 Zugspitze, Garmisch-Partenkirchen, Germany

Panorama 2962 Zugspitze, Garmisch-Partenkirchen

At Panorama 2962 atop the Zugspitze, Germany's highest mountain, state-of-the-art restaurant architecture meets innovative kitchen design. From its elevation at almost 3,000 meters, diners experience the natural spectacle first hand, gazing out over the magnificent panorama through floor-to-ceiling window facades while enjoying Alpine delicacies in a pleasantly climate-controlled setting. Uponor underfloor heating Classic ensures draught-free and comfortable radiant heat in Germany's summit restaurant. What's more, the designer and specialised construction company also opted for proven quality by installing composite piping from Uponor for the facility's drinking water system and interconnecting heating system.

Project facts

Garmisch-Partenkirchen, Germany
Hospitality
Radiant heating and cooling, Multilayer pipe systems
Completion: 2018

Uponor Involvement

720 m2 of Uponor underfloor heating Classic | 250 m of Uponor composite piping for connecting heating lines | 500 m of composite piping for drinking water distribution system

Cosy temperatures in the mountaintop restaurant

The Panorama 2962 summit restaurant opened in July 2018 by the operating company Bayerische Zugspitzbahn Bergbahn AG combines a unique 360° panoramic view of the Alps with exquisite culinary delights to create an extraordinary Alpine experience. Fitting to the sweeping, breathtaking lookout across four nations, the menu features dishes from Germany, Italy, Austria and Switzerland. The restaurant offers indoor space for up to 450 diners, – plus seating outdoors for 850 more guests.

Pleasantly climate-controlled with underfloor heating

Visitors enjoy the warm interior ambiance of the Panorama 2962 summit restaurant all the more because outdoor air temperatures atop the Zugspitze rarely climb higher than five degrees Celsius (41°F), even in midsummer. Some 720 m² of Uponor underfloor heating Classic ensure comfortable radiant heat throughout the restaurant's interior. Radiators and air curtains are used in the entrance area and in the stairwell.

The Zugspitze is not only the coldest place in Germany, but also its sunniest, having long averaged 1,800 annual hours of sunshine. Understandably, a south-facing photovoltaic solar power system has been installed on the valley side of the building and on its roof, generating power to supply the three 45 kW cartridges for firing the building heating system water in the 300-litre buffer storage tank. Most of the power produced directly feeds the system. 

Heating connecting lines and drinking water distributing lines of composite pipe

The heating water is heated up to a temperature range of between 35 and 45°C. The radiators and heating distributors for the underfloor heating system are connected by 250 meters of Uponor composite piping MLC with sizes ranging from 16 to 40 mm.  

The water is preheated up to tap temperature in a 1,000 L hot water preparation buffer storage tank. A good 25% of the heating energy needed for this is generated by the waste heat from the refrigeration machines for the cooling cells in the kitchen using plate heat exchangers.

Every day, 6,000 litres of drinking water are pumped up to the top station from the valley station at Lake Eibsee. Drinking water supply is provided on four floors via 500 m of distribution and riser pipes that use the Uponor composite pipe system. Apart from the kitchen, the main consumers are the WC facilities.

„Naturally, the Top of Germany needs top quality“. 
Erwin Bouvier, Managing Director of the Bouvier Group

Panorama 2962 Zugspitze, Garmisch-Partenkirchen

uponor referenz panorama zugspitze desktop1

Project information

Project information

Address
82475 Garmisch-Partenkirchen
Country
Germany
Website
https://www.zugspitze.de/
Completion
2018
Project Type
New building
Building Type
Hospitality
Product lines
Uponor Classic, Uponor MLC

Partners

Partners

Builder-owner:
Bayerische Zugspitzbahn Bergbahn AG
www.zugspitze.de

Design: Johannes Hasenauer Technisches Büro GmbH, Maishofen
www.tb-hasenauer.at

Construction: Luzian Bouvier Haustechnik & Fliesen GmbH, Pflach
www.bouvier.at

 

Similar projects

Cavalier Hotel

Cavalier Hotel

See how a century-old luxury hotel receives a major renovation that includes an Uponor PEX plumbing system...
Zugspitz Resort, Ehrenwald

Zugspitz Resort, Ehrenwald

Das Zugspitz Resort am Fuß des Wettersteingebirges setzt in den Bereichen Fußbodenheizung und Kühldecke auf die Produkte und das Know-how von Uponor
Hotel Bellevue

Hotel Bellevue

Uponor has delivered a solution for underfloor heating and cooling to Superior City Hotel Bellevue ****. The hotel provides spacious and modern rooms and suites which meet all of the guests needs. One of them is a comfortable room temperature throughout the year. 

Villages Nature (R) Paris

Villages Nature (R) Paris

Villages Nature (R) Paris is a new european vacation destination and a major innovation in family-friendly sustainable tourisme, designed entirely around the quest for harmony between Man and Nature.

Heiligenhafen Pier 2

Heiligenhafen Pier 2

Uponor Ecoflex Supra Plus provides frost-free drinking water and waste water transportation at Heiligenhafen Pier all year round.
aquaTurm Radolfzell

aquaTurm Radolfzell

The former water tower in Radolfzell was converted into the zero-energy design hotel aquaTurm, with the Klett and Smatrix Base solutions from Upanor being used for heating and cooling.

Al-Kalaa Hotel

Al-Kalaa Hotel

Uponor provides the world's largest hotel and shopping mall complex in Mecca, Saudi Arabia, with Uponor mulit layer composite pipe systems for the bathrooms.
Hotel Mediterraneo - Sauna

Hotel Mediterraneo - Sauna

Located in Amantea, a lovely village on the coast od Calabria, founded in the 600s, the Hotel offers modern rooms and all the best comforts.

Leonardo Hotel, Bristol, UK

Uponor provides water solutions for Leonardo Hotels’ new 200-bed Bristol resort

The Jurys Inn Group has utilised a variety of high-end heating and plumbing solutions from Uponor, the total solutions provider of systems for the safe transportation of water around a building, for a new 200-bed, Leonardo Hotels branded facility in the heart of Bristol

Located in Temple Way at the gateway to Bristol’s Temple Quarter business district, close to the main train station and within walking distance of the city centre, the new hotel will become a popular destination for tourists and business travellers alike when it opens in early 2021.

To ensure that the hotel’s users would be provided with a hygienic water supply and a highly reliable heating system, the project’s M&E contractor Totus Engineering worked closely with Uponor on the building’s plumbing and water network.
H-Tower in Kiev

H-Tower in Kiev

H-Tower, the luxury residential complex in the centre of Kiev, Ukraine is scheduled to open for business during spring 2012.
Wilshire Grand

Wilshire Grand

An Uponor radiant cooling system keeps the integrity of the world’s largest concrete pour for the tallest building west of the...
Radisson Blu

Radisson Blu

See why the the first hotel to be connected to the Mall of America brought in Uponor PEX as the plumbing solution for this...
Hospital Østfold Kalnes

Hospital Østfold Kalnes

Kalnes, Sarpsborg, 27.02.2014

Uponor is proud to deliver flexible tapwatersystem, underfloor heating and snow and ice melting system to the new hospital Kalnes.
Frank Myhrer, Sales Manager Østfold

Read more about the project on this site Byggeindustrien.no