Tapaustutkimus

Sustainable solution for Denmark’s largest infrastructure project, Rødby, Denmark

Sustainable plastic replaces steel

The Fehmarnbelt Tunnel linking the Danish island of Lolland with the German island of Fehmarn is
Denmark’s largest ongoing infrastructure project. But it’s not just a construction site – it’s also a residence
for approximately 1,300 employees. Durable Weholite tanks with a lifespan of 100 years will ensure a sustainable
and economical solution to provide employees with clean drinking water and good sanitary facilities 24/7.

Projektin tiedot

Rødby, Denmark
Tie- ja liikennerakentaminen
Valmistuminen: 2021

Sustainable solution for Denmark’s largest infrastructure project

The Fehmarnbelt Tunnel linking the Baltic Sea regions of Denmark and Germany is one of Europe’s largest ongoing infrastructure projects. This combined road and rail tunnel will be 18 kilometres long, featuring a four-lane motorway and a double-track electrified rail line. Travel time across the Baltic Sea will be cut from 45 minutes by ferry to around 10 minutes by car and 7 minutes by train. 

The immersed tunnel will consist of 89 individual elements. With a 17.6-kilometre submerged section, it will be by far the longest immersed tunnel in the world. Its foundations will reach more than 40 metres below sea level, making it one of the deepest tunnels of this type as well. The tunnel is expected to be opened in 2029.

Facilities for 1,300 employees
Now, accommodation facilities are being established for the employees, who are gradually making their way to Lolland and their jobs for the next many years.

Esbjerg Maritime Service (EMS Aps), with Uponor as its subcontractor, was awarded the contract by the consortium Femern Link Contractors (FLC) for ensuring clean drinking water and sanitary conditions for the working staff. FLC is in charge of the design and construction of the tunnel, the portals and the ramps.

“This isn’t just a construction site. It’s also the residence for approximately 1,300 employees moving their lives to Rødbyhavn to work on the largest construction project in Danish history. It’s essential to ensure that there’s clean drinking water and good sanitary facilities 24/7,” says Bent Rønfeldt, Project Engineer at Uponor Infra.

Uponor is manufacturing, delivering, and installing the plastic tanks needed for drinking water and wastewater
solutions for staff accommodation, as well as for the factory where the employees work. The tunnel elements for the Fehmarnbelt link will be produced at a large purpose-built factory east of the coastal town of Rødbyhavn on Lolland Island. The factory will be equipped with a temporary new harbour where most of the raw material for element construction will be delivered by sea.

The port at Rødbyhavn will be the largest of its kind in Northern Europe. This also means that both drinking water and wastewater must be transported over long distances.

“This requires a lot of energy, especially when many smaller distribution points are used. Therefore, Uponor's task is to create a compact and optimised central solution that is more energy efficient,” says Rønfeldt.

Prioritising the sustainable angle
EMS has prioritised the sustainable angle of the project infrastructure, an issue that’s very important to Uponor, too.

“Uponor Infra Project Service has the expertise and knowhow from numerous previous projects to manage the task. It’s exciting to be part of such a comprehensive project,” Bent Rønfeldt says.

The original plan was to use steel tanks for drinking water and wastewater solutions. However, it soon became clear that lightweight and easy-to-handle plastic tanks will shorten both delivery and installation time.

"As a maintenance-free solution with an estimated lifespan of 100 years, the tanks will ensure a long-term sustainable solution for not only the Fehmarn project, but also future projects. This was in every way the most economical choice in both the short and long run,” says Tom Sørensen, Project Manager at EMS Aps.
Plastic has undeniable advantages: it’s a durable and flexible material, and when made of polyethylene or polypropylene, the tanks have no risk of corrosion. In addition to this, Sørensen points out that one significant advantage is that the control system and all the fittings of the tanks can be connected before delivery to
the construction site.

Uponor delivered to the site a total of seven Weholite tanks with an inner diameter of 3,000mm. Three of the tanks are for drinking water with capacity of 100m3, the three tanks for sewage are of 100m3 and 75m3. In addition to this, Uponor supplied a 20m3 tank for process water. All the tanks have already been installed.

Excellent for industrial solutions
Plastic, with its long lifespan, high chemical resistance, and minimal need for maintenance, is often a better choice than steel, even in industrial solutions.

“EMS Aps is a supplier to the oil and gas sector, energy sector and wind energy, as well as power-to-X process plants. The fact that they made the decision to use plastic solutions for the Fehmarnbelt project emphasises that various applications can be implemented with plastic in industrial sectors where steel has traditionally been the material of choice,” says Bent Rønfeldt.

Once the workers’ village in Rødbyhavn has been established, the new partners Uponor Infra and EMS Aps will move on to work on the factory where the tunnel elements will be produced. The collaboration between the two companies is the start of a forward-looking partnership that, in the long run, will serve many different industrial sectors.

Projektin tiedot

Projektin tiedot

Maa
Denmark
Valmistuminen
2021
Projektityyppi
Uudisrakentaminen
Rakennustyyppi
Tie- ja liikennerakentaminen
Tuotelinjat
Weholite for gravity renovation, Weholite for sewer gravity

Samankaltaisia projekteja

Lahdessa jalkakäytävä sulana läpi vuoden

Lahdessa jalkakäytävä sulana läpi vuoden

Lahden kaupungin pääkadun Aleksanterinkadun muutostyöt valmistuvat vuoden 2016 loppuun mennessä. Kaupungin kehittämishankkeet muokkaavat ydinkeskustaa kävelyä ja joukkoliikennettä suosivaksi. Uponor on mukana hankkeessa toteuttamassa sulanapitoa ja niihin liittyviä runkolinjoja Aleksanterinkadun jalkakäytäville ja suojatielle. Erityistä on, että hankkeessa käytetään ensimmäistä kertaa Suomessa Uponorin uutta Ecoflex  Thermo Single 125/250 –putkea.
Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Retention tanks for the multimodal terminal

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.
Modernization of the lock on the barrage

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.