Töltse meg a BIM kosarat a termékkatalógusból
Ügyfélszolgálati e-mail címünk megváltozott – Áttekintés

Referenciák

547 Megtalált eredmények
Irodaépület

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.

Ipari

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.

Hotelek

Château Gbeľany

Internal distributions of health technology - footboards and horizontal distributions from dimension 20 to 90.

Nyilvános épület

Renovation of the sewage collector

In 2021, a renovation of a corroded sewage collector was carried out in Swarzewo using a tight-fitting method.

Szállítás

Renovation of the railway culvert

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a railway culvert.

Szállítás

Retention tanks for the railway station

The modernisation of the Warsaw West railway station is the largest construction project currently underway in the Polish capital.

Nyilvános épület

Battery of retention tanks

In Mielec, modern storm water and snowmelt retention systems have been built, which will solve the problems with periodical flooding of streets and buildings in the city centre.

Nyilvános épület

Emergency pipeline on a pontoon bridge

In 2020, Uponor did an outstanding job of installing an emergency pipeline on a pontoon bridge after an underground GRP sewage collector failed in Warsaw, the capital of Poland.