Aizpildiet BIM iepirkumu grozu no produktu kataloga

551 Atrastie rezultāti
Weholite limits overflows and pollution in London
Publiskās ēkas

Weholite limits overflows and pollution in London

Uponor’s Weholite technology was the key solution in a unique project in London, where the Lee Tunnel and Thames Tideway tunnel have the task of capturing an average of 39 million tonnes of sewage a year from the 35 most polluting combined sewer overflows (CSOs). An upgraded pipeline system was designed to reduce the number of overflows – and their environmental impact – from the sewers and treatment systems serving London. A particular aim is to limit pollution from the sewers and treatment systems connected to the Beckton and Crossness sewage treatment works.

Elverum Helsehus installed intake and outlet ventilation from Uponor Infra
Veselības aprūpes iestāde

Elverum Helsehus installed intake and outlet ventilation from Uponor Infra

The largest building project during 2017

Uponor Vortex stormwater solution
Publiskās ēkas

Uponor Vortex stormwater solution

The City of Espoo is the first in Finland to introduce the Vortex stormwater separation chamber. It can be used to efficiently separate floating and descending solids from stormwater. The aim is to reduce the maintenance costs of the retention system built from stormwater tunnels and prevent solids from ending up in waterbodies.

Comprehensive modernization of wastewater treatment plant
Publiskās ēkas

Comprehensive modernization of wastewater treatment plant

The modernisation of the wastewater treatment plant is a key task of the project "Comprehensive modernization of wastewater treatment plant in Opole along with improvement of water and wastewater management".

Residential project with underfloor heating adapted for apartments
Daudzdzīvokļu ēka

Residential project with underfloor heating adapted for apartments

The Bävern block, located in the center of Karlstad, is a residential building that was completed in early 2023. Skanska, who built the homes, chose Uponor underfloor heating instead of radiators and also a variant that is completely new on the Swedish market and is adapted for multi-family buildings.

Rivergate
Biroja ēka

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.

Bavaria Motel
Viesnīca

Bavaria Motel

High level of comfort meets low energy costs

Villeroy & Boch
Biroja ēka

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.

Multi-family homes
Daudzdzīvokļu ēka

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.

New office in Västerås with a focus on modern and environmentally friendly solutions
Biroja ēka

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.

Infinity Forest Residence
Daudzdzīvokļu ēka

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.
 
 
Underfloor heating and cooling for comfortable living in a summer cottage house
Privātmāja

Underfloor heating and cooling for comfortable living in a summer cottage house

The new summer cottage house in Suolahti, Äänekoski, is using floor heating and cooling controlled by an Uponor Smatrix Pulse control system. The heat source will be a NIBE geothermal heat pump. Uponor and NIBE were responsible for the design and sizing of the heating and cooling system for the new house.