395 Resultat hittades
Kontor

The Kastelli community utilises smart building services

The Kastelli community centre, which was completed in 2014, is the City of Oulu's educational, leisure and culture centre that serves the residents of the city in many different ways. Uponor's underfloor heating system has been installed in the building.

Industribyggnad

In place in a couple of days

The waste water channel for the pulp line of the mill, which was renovated in 2017, was commissioned in the 1960s. Now there were fear that it would collapse. The new solution was Weholite.

Kontor

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.

Enfamiljshus

Getting rid of indoor radon

Uponor's radon system was installed in a detached house in Ilomantsi, completed in 1987. Previously, the radon values in the house were 1,188 becquerels. After installing the system, the radon values dropped to 83.

Flervåningshus

Feeling comfortable and relaxed in loft apartments

The old factory building gets a new life as loft apartment building. Skanska Oy renovated the building into 23 different size and type of apartments.

Flervåningshus

Durability and quality are crucial in the award-winning wooden apartment block

All solutions in the Puukuokka block, which was completed in Jyväskylä, have strived for sustainability, quality and coziness. Living comfort and energy efficiency are also ensured by radiant underfloor heating system installed in each of the block’s 186 homes.

Kontor

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.

Flervåningshus

Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation