Uponor VVS
Fallstudie

Santa Maria Assunta Cathedral - Teramo, Italy, Teramo, Italy

Santa Maria Assunta Cathedral - Teramo, Italy

Projektfakta

Teramo, Italy
Kommunal mark
Värme och kyla
Färdigställt: 2007

Uponors roll

1031
The Teramo Cathedral is situated in the heart of the city, and it is centered among four historical neighbourhoods: San Giorgio, Santo Spirito, Santa Maria a Bitetto and San Leonardo.

The Cathedral, with is imposing structure and its bell tower, it is one of the most important religious and architectonical buildings in the Abruzzo region, and it has always been the visible centre of this city as well as its symbol.For this project Uponor installed an underfloor heating system.

The state of the cathedral called for a conservative intervention, and the underfloor solution was the ideal one in order to provide a comfortable environment for the faithful as well as to preserve the feature of such historical building. The underfloor panels work a positive action in preserving the hygienic environmental conditions, because they do not allow the creation of humid areas in the floor, which could cause mold and degrade the condition of the paintings and frescoes in the Cathedral.

Santa Maria Assunta Cathedral - Teramo, Italy

0001772

Projektinformation

Projektinformation

Adress
Piazza Martiri della Libertà 14
Land
Italy
Hemsida
http://www.diocesiteramoatri.it
Färdigställt
2007
Projekttyp
Renovation
Byggnadstyp
Kommunal mark

Samarbete

Samarbete

enduser
Diocesi di Teramo-Atri

contractor
Edilcostruzioni Group srl

specifier
Ing. Giuseppe Grotta

installer
Tecnoimpianti srl

Liknande projekt

KULMER's castle

KULMER's castle

A replica of Kulmer’s castle was constructed based on a project designed by a renowned Zagreb architect Branko Kincl.
Tailored renovation solution

Tailored renovation solution

The Vierimaantie road, located close to the town centre of Ylivieska, Finland has a concrete sewer line constructed in the 1960s and 1970s. A decision was taken to renovate this sewer using a tailored solution, and the product developed for this purpose is now also available to other customers.
European Hospital of Marseille

European Hospital of Marseille

The European Hospital is structured around poles of excellence that already made the reputation of Ambroise Paré and Paul Paré Desbief institutions. His care offer is completed by a modern and comprehensive technical platform.
American School

American School

“Move!” We are convinced, that sports, primarily mass sports and leisure time sports, have an emphasised role in Hungary today – both from a pedagogical and a medical point of view.
National Theatre

National Theatre

The building of the Hungarian National Theatre is one of the most famous and most modern buildings of the city. The theatre is on the banks of river Danube.
Gardens by the Bay, Singapore

Gardens by the Bay, Singapore

Gardens by the Bay comprises two glass-domed conservatories and one waterfront garden in the heart of Singapore, around the Marina Channel. Uponor is proud to supply its radiant cooling solution to this premier tropical garden city.
Meander

Meander

Large, modern and fitted with the latest in air conditioning technologies. In 2012, construction work got underway on a new world class hospital on Maatweg in the Dutch city of Amersfoort. The building has since been handed over, and patients can now be better accommodated than at the old sites in Amersfoort.
Elementary school in Poznan

Elementary school in Poznan

This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011.
EMT: Bus depot, Madrid

EMT: Bus depot, Madrid

The Empresa Municipal de Transportes de Madrid, SA (EMT) installs Uponor´s Invisible Air- Conditioning system in the newly renovated bus parking facility.
Umwelt Arena

Umwelt Arena

Opening in 2012, the Environmental Arena offers business and organisations from the environmental sector the largest and most spectacular platform for promoting environmental issues and energy efficiency.
IKEA

IKEA

The IKEA homestore in Rothenburg in the Canton of Lucerne, uses the TABS Thermally Active Building System from Uponor to cater for heating and cooling requirements.

Inselspital

Inselspital

The intensive care, emergency medicine and surgery centre of the Inselspital hospital in Bern, known as the INO, is efficiently heated and cooled using Uponor Contec Single.

Muottas Muragl

Muottas Muragl

Muottas Muragl is a popular mountain vantage point in St. Moritz. Work began on the refurbishment of the mountain resort hotel in 2010. Uponor supplied the radiant heating/cooling system for the project.
Tom Mutters School

Tom Mutters School

For the Tom Mutters School renovation, Uponor Minitec and Knauf Levelling Screed 425 were used to achieve a low profile, despite having to add levelling.
Abbey of Praglia

Abbey of Praglia

Selected for maximum flessibility and durability, Uponor's preinsulated pipes connect the wood chip boiler to the pump unit located within the abbey perimeter.