Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

1. FC Brno, Football stadium, Brno, Czech Republic

Heating of Football Stadium

Коротко про проєкт

Brno, Czech Republic
Спортивні комплекси
Поверхневе опалення/охолодження
Рік завершення будівництва: 2008

Вклад Uponor

9440

How to extend the playing season?

Heating grass playing surfaces Uponor keeps playing surface throughout the year in optimum conditions, ie. free of ice and snow. Excellent and stable conditions are dream of every professional athlete.

The heating pipe loops are implemented Meltaway Uponor PE-X 25 x 2.3 mm. Total installed about 38 km of pipelines. Uponor pipe manifolds are made ​​from HDPE (as needed supplied in 50 x 4.6 mm - 200 x 11.4 mm). Pipe connection to manifolds is realized by special plastic fasteners Rosex. Parts of manifolds are connected pipe butt welding. All system components are plumbing Meltaway of plastic materials, ie. Unlike competing ways of dealing with it is absolutely excluded the possibility of corrosion. Serves as a source of heat exchange station. The system is filled with antifreeze.

1. FC Brno, Football stadium

0002763

Інформація про проєкт

Інформація про проєкт

Країна
Czech Republic
Рік завершення будівництва
2008
Тип проєкту
Реконструкція
Тип будівлі
Спортивні комплекси
Продуктові лінійки
Neva, Meltaway

Подібні проєкти

Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Stades de Bienne

Stades de Bienne

 

The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).

Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.