Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

Addenbrookes Hospital, Cambridge, United Kingdom

Addenbrookes Hospital

Коротко про проєкт

Cambridge, United Kingdom
Спортивні комплекси
Система гнучких труб для водопостачання та радіаторного опалення
Рік завершення будівництва: 2007

Вклад Uponor

no information available
First opening its doors in 1766, Addenbrook hospital was one of the first provincial voluntary hospitals in UK, and at the time housed just 20 beds and 11 patients; a far cry from the patient level of today. The Cambridgeshire landmark has now been in operation on its new site since the invention of the National Health Service in the 1960s and is currently undergoing a renovation program to replace all the service pipework throughout the hospital in preparation for an extension to be ready in 2020. With punctuality a key issue in working hospital, Installers James Brown Mechanical services choose to opt for Uponor flexible large diameter pipework to get the job completed.

The versatility of Uponor MLC system allows it to be used throughout the project in the process of replacing all the existing service pipework from metal to plastic. Uponor MLC pipe has a full WRAS Scheme approval for use in drinking water applications in the UK, making it ideal for pressurised hot and cold water systems. The Uponor MLC pressfit jointing system
used by the installers is simply effected by bevelling the pipe, inserting the fitting and pressing with an Uponor 'Mini Gun 32', a process which takes only a matter of seconds.

Uponor's MLC pipe is recognised for being a market leader in the flexible plumbing market. The pipe enjoys a 100% oxygen tight construction (which prolongs the life of your pumps and other equipment sensitive to corrosion), form stable yet flexible plumbing technology (bends when you want and remains rigid when you need it to) and lastly limited expansion and smooth internal bore (allows the pipe to be used in hot and cold water, as well as heating applications without deterioration in the pipe's size or shape). The high spec nature of the project meant that by having all the pipework in Uponor MLCP, Addenbrooks were able to have a fast 'hassle-free' plumbing solution.

Addenbrookes Hospital

0001033

Інформація про проєкт

Інформація про проєкт

Адреса
Cambridge University Hospitals
Країна
United Kingdom
Сайт
http://www.cuh.org.uk/addenbrookes-hospital
Рік завершення будівництва
2007
Тип проєкту
Реконструкція
Тип будівлі
Спортивні комплекси

Партнери

Партнери

Installer
James Brown Mechanical Services

Подібні проєкти

Icerink in "Városliget"

Icerink in "Városliget"

The history of the skating-rink The skating-rink of the Városliget, which was opened in 1926, was the second skating-rink (after Vienna) in Europe. In WWII it suffered a bomb hit, and in the 1950's it was only repaired temporarily. The latest large-scale renovation was carried out in 1986, when the modified power-house and condenser plant were installed, and the new, third layer of pipes was laid on the rink. After some small and large engineering modifications (1999 to 2001) – since the engineering system was outdated and spoiled – Municipality of Budapest called for a tender for comprehensive architectural and engineering reconstruction of the Skating-rink of Városliget.
Stades de Bienne

Stades de Bienne

 

The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).

Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.