Icerink in "Városliget", Budapest, Hungary

Icerink in "Városliget"

Коротко про проєкт

Budapest, Hungary
Спортивні комплекси
Поверхневе опалення/охолодження
Рік завершення будівництва: 2011

Вклад Uponor

14800
The big renovation

The city municipality and the National Development Agency signed the support agreement for the renovation of the Skating-rink of Városliget, and the attached building blocks, on December 15, 2008. In the framework of the renovation, besides the reconstruction of the ice-rink and the receiving building, they re-build the side-wing which was bombed down in WW II. Out of the almost 4.7 billion HUF development cost, 3.175 billion HUF was made available from EU subsidy. The work was done in two phases. In Phase I, the construction of the new cooling power-house was completed, while in Phase II complete renovation of the monument skating house and the construction of the skating-rink and ice-hockey rink was completed. After the full reconstruction, the Skating-rink of Városliget became the largest open-air skating-rink of Europe, which also meets the requirements of the Association. The surface of the rink is 14,800 m2, it is open from mid-October to mid-March. Maximum cooling power demand is 4.5 MW, built-in nominal cooling power is 5 MW. The rink pipes, fastened to a steel reinforcement net at a clearance of 80 mm, are made from cross-linked PEX pipes (Uponor product), the total length is 198 km. Phase II of the full reconstruction, the complete renovation of the monument skating house and the construction of the skating-rink and ice-hockey rink started in the summer of 2010. The work started with build-down of the building to its skeleton, removal of the 3 layers of pipes below each other, and transportation, crushing, grinding, and re-using of the removed concrete. Then the soil of the rink was replaced and layers were built along with covered tunnel (which is under water in summer). On the lower layer of concrete, insulation, fastening layer with the steel pipe holders, and then the PEX cooling pipes were installed. Pipes were installed 80 mm from each other, fastened to the steel structure by plastic clamps. After laying down the pipes, pressure test was carried out, then the concrete layer was poured, maintaining 2 bar pressure in the pipes. The slope of the rink is less, than 30 mm, waviness of the concrete is below 6 mm. This provides for the uniform thickness and high quality of the ice. Rink pipes are connected to the manifolds in the pipe drift with Rosex disconnectable connections. Installation was carried out under supervision and with consultation from the supplier Uponor. At the skating-rink supply and drain manifolds are placed on opposite sides, while at the ice-hockey rink manifolds are on the same side in the pipe drift. The skating-rink is divided into six sections, each section may be disconnected from the cooling system, while the ice-hockey rink can only be operated in full. In the pipe drift, which starts from the power-house, and can be walked around, special HDPE (special polyethylene) Uponor pipes are connected with manifolds to the main pipelines. Rink pipes are connected to these pipes by disconnectable connections. The skating-rink re-opened after a two-year hiatus in December 2011, and between January 6 and 8, 2012 the International Speed Skating Association organized the complex European Championships, with great success.

Icerink in "Városliget"

0002903

Інформація про проєкт

Інформація про проєкт

Адреса
Olof Palme sétány 5.
Країна
Hungary
Рік завершення будівництва
2011
Тип проєкту
Реконструкція
Тип будівлі
Спортивні комплекси

Партнери

Партнери

architect
Manyi Stúdió
1122 Budapest, Határőr út 13/b.
Magyarország

contractor
Hérosz Építőipari Zrt.
1095 Budapest, Hídépítő u. 1-12.
Magyarország

Подібні проєкти

Stades de Bienne

Stades de Bienne

 

The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).

Ashville Sports Centre, Harrogate

Ashville Sports Centre, Harrogate

As part of a £3million project, Ashville Sports Centre will be redeveloped by September 2017.
Once completed, the sports centre will boast a significantly enlarged gymnasium, a studio, 9 changing facilities, a reception/café area and new staff offi ces. The swimming
pool will also be redecorated and receive much needed maintenance.
CEF headquarters, Durham

CEF headquarters, Durham

When national electrical wholesaler company, City Electrical Factors (CEF), decided to invest in construction of a new 3,500m2 headquarters to provide a more contemporary, fit for purpose and environmentally efficient office environment, the resulting design from architect Faulkner Brown was a very conceptual, fair faced concrete building.
Manchester Metropolitan University, Manchester

Manchester Metropolitan University, Manchester

The innovative building, incorporates three individual towers and two atria and  boasts not only world-class teaching and learning facilities for students, staff and businesses, but also catering and leisure areas for all students, and conference venues which will draw companies and industry associations from across Europe and beyond.