Case study

Energy Efficiency Center, Würzburg, Germany

Energy Efficiency Center

Project Facts

Würzburg, Germany
Office
Radiant Heating & Cooling
Completion: 2013

Uponor Involvement

3.580 m²

The Energy Efficiency Centre is being built on the converted Hubland site not far from the university campus and will provide a unique research and demonstration facility for Germany in a project costing EUR 10.5 million that is funded by the Bavarian Centre for Applied Energy Research (Bayerisches Zentrum für Angewandte Energieforschung e. V. - ZAE Bayern). Uponor is a partner in the pioneering building, which is being prepared for DGNB Silver Certification.

Designed by Thomas Rampp, the 3,580 m2 building represents a real game-changer thanks to its bright roof membrane. The translucent outer skin spans the multi-layered roof superstructure, providing weather protection. The revolutionary membrane coating is one of several unusual concepts and products being used for the first time.

The aim of the ZAE is that the building should not just present high-tech ideas, but also to conduct a long-term evaluation of solutions that have been combined and optimised under realistic conditions for maximum energy- and cost-efficiency and to investigate and optimise interactions.
The central building controller and an associated research server are continuously supplied with data from 1,500 measuring points for this purpose. In addition, the weather forecast data from the meteorological service in Offenbach and the utilisation levels of conference rooms are also integrated for predictive energy usage.

The scientists are not just focusing on the measurable data, but also the perceptions of the building's users. "The building's sophisticated technology must be intuitive and must enhance well-being", insists Dr. Hans-Peter Ebert, Head of the Department of Functional Materials and Energy Technology. Naturally, this principle also applies to the cooling and heating system used in the two-storey building. The building services engineering planners, Ebert-Ingenieure GmbH Co. KG, consciously chose very different and innovative low-temperature concepts.

The Energy Efficiency Centre uses a steam-based district heating supply. A pipe manifold heat exchanger is used to produce pumped hot water from the district heating network to cover the heating requirements of the central heating system. The building's primary energy requirement of 151 kWh/m2a is covered using static heating panels and heating registers for the air conditioning system and for producing hot water in periods when the solar energy system is idle. The innovative insulating materials and well-conceived heating concept mean that the building only needs half the primary energy defined for new buildings according to the German government's Energy Saving Ordinance (EnEV).

Uponor Klett underfloor heating is used in the foyer, information centre and conference room to ensure draught-free comfort. However, the EEC is more than just a grand research project. One of the main purposes of the project is to increase public awareness of energy-efficient building services engineering. Hence the building is also to be used for exhibitions. To keep the space as flexible as possible, the architects and building systems engineers chose underfloor heating.

The expert fitters from Bechert Haustechnik GmbH installed a 347 m2 radiant heating system with 24 heating circuits. Uponor PE-Xa RED Klett pipes, size 16 mm x 1.8 mm, were laid 10 cm apart in the conference room and 15 cm apart in the information centre and foyer area. With a flow temperature of 39.7 °C (return 32.6 °C) the underfloor heating system covers a heat load of 41 W/m2 in the public areas.

"This new building will be our calling card", emphasises Prof. Vladimir Dyakonov, President of ZAE Bayern, explaining his organisation's aim to offer employees and visitors the best possible conditions.

Energy Efficiency Center

gallery_1_zae_bayern_energy_effiziency_center_desktop

Project Information

Project Information

Address
Bayerisches Zentrum für Angewandte Energieforschung e. V. (ZAE Bayern)
Country
Germany
Website
https://energy-efficiency-center.de/
Completion
2013
Project Type
New building
Building Type
Office
Product lines
Klett

Similar projects

Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti

In November 2011 one of the largest shopping centers of Finland was opened in Lahti. The Karisma shopping centre is one of Finland´s largest shopping centers measured by sales area and number of stores. Developer of Karisma is Kesko. Construction of Karisma has been one of the biggest investments ever in retail trade of Kesko. The main contractor of Karisma was SRV Rakennus ltd.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Klimahaus Bremerhaven 8°

Klimahaus Bremerhaven 8°

The Klimahaus Bremerhaven 8° Ost in Germany is a science centre that presents climate and climate change topics in a comprehensible scientific manner.
Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Berliner Bogen

Berliner Bogen

Berliner Bogen in Hamburg – cutting-edge architecture combined with state-of-the-art technology
Ericusspitze Spiegelhaus

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.
Kranhaeuser

Kranhaeuser

Fantastic, modern architecture directly on the Rhine in Cologne - the Kranhaus buildings
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

Leitradlofts, Cologne

Leitradlofts, Cologne

A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Palazzo Ferrazzi - Brescia

Palazzo Ferrazzi - Brescia

Uponor brings the comfort of its Underfloor Heating & Cooling to a prestigious renovation project to transform a Norther Italy 1700s Palace into comfortable offices
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
National Library of Latvia

National Library of Latvia

National Library of Latvia is the most impressive industrial project in Latvia of the last decade. Uponor provided the building with Uponor underfloor heating and MLCP pipes.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
BAE Systems Rochester

BAE Systems Rochester

BAE systems are the third largest global defence company, delivering a range of products for the air, land and naval armed forces.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Villeroy & Boch

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.
Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.