Zero emissions, maximum comfort, Gijón, Asturias, Spain
Zero emissions, maximum comfort
Greenspace PCTG in Asturias, Spain, is the first net-zero energy office building in the region and one of the few of its kind in the whole country. An impressive achievement made possible by a combination of highly efficient active energy and passive systems. Spanish architects EMASE Arquitectura worked with engineering firm SvR Ingenieros to create a sustainable, environmentally friendly design. It uses solar panels for keeping solar loads out of the building on one hand and to generate more energy than the building consumes on the other hand. In order to minimise the building’s energy use, the project partners turned to Uponor and its thermally active building systems (TABS) for heating and cooling.
Project Facts
Uponor Involvement
Between the basement, the three above-ground floors and the roof, Greenspace covers a total area of 1,500 square metres. Since it was opened in Gijón Technology Park in July 2020, it has hosted a range of start-ups and other companies with a focus on innovation and digital technology.
Minimising energy consumption
Greenspace has a positive energy balance: this means the building generates more power than it uses thanks to extremely efficient active and passive energy systems. The passive systems include, for example, insulation or natural lighting. The active systems involve the solar panels, the indoor climate solutions through the TABS and the radiant floor heating, as well as the monitoring and control of the building services.Uponor provided the thermally active building system (TABS) which makes use of the thermal inertia of the building’s concrete structures. A network of 7,500 metres of Uponor Comfort Pipe PLUS was built into the structure of the building, using concrete core activation to store and release both heat and cold. The pipes carry water for the building’s heating and cooling systems and provide comfortable temperatures all year round. With the HEAT2 simulation software from Uponor, the project partners in Gijón were able to analyse the building’s static and dynamic thermal behaviour over time. This was the key to finding out the best way to use TABS.
Internationally certified
The energy concept includes much more, for example 134 solar panels, a lift that uses the energy of this panels or low-energy LED bulbs, controlled by intelligent sensors. The result of all these measures: a very pleasant working environment fostering creative thinking and high productivity. The range of energy efficiency and bioclimatic design measures employed, together with the use of renewable energy, healthy architecture, and low-emission materials, has seen Greenspace earn gold certification from LEED. This certification places Greenspace among the most sustainable buildings in the world.“We needed a heating and cooling system that was tailored to the building structure while also being energy-efficient enough to fit in with our energy calculations and hydraulic design requirements,” says Ramón van Riet from SvR Ingenieros.
Project Information
Project Information
Partners
"With the support of Uponor's technology, EMASE Arquitectura and SvR Ingenieros were able to determine the ideal size for the solar panels and enery distributions systems." Ramón van Riet, SvR Ingenieros.
Architects: Emase Arquitectura, Madrid
https://www.emase.info/
Consultancy and LEED certification: Arup, Madrid
https://www.arup.com/
Project management and LEED commissioning: SvR ingenieros, Asturias
http://www.svringenieros.es/
Promoter: GesyGes Innovación en la Edificación
Similar projects
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Day-care centre to be built with energy piles
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
First Uponor Comfort Panel project in Hungary
Uponor's head office is a model example of energy efficiency
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Rivergate
Berger Logistik
Vestas headquarters
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
HAMK's zero-energy hall uses energy piles
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Villeroy & Boch
Bahnhofpark, Sargans
Austro Tower
Poslovni centar Adris grupe
City Hall
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.