Uponor Verkoopseenheid Benelux
Industriestrasse 56, 97437 Hassfurt, Germany

References

16 Gevonden resultaten
Vervoer

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.

Vervoer

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.
 
Vervoer

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.

Vervoer

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.

Vervoer

Ease of installation is key

Weholite pipes are light and easy to install. They really come into their own in a project in the harbour of Auckland, the largest city in New Zealand – the extension of an old stormwater line using massivepipes with an internal diameter of 3–3.5 metres. In this busy harbour area, it is not possible to carry outlarge-scale excavation work. The soil of the region and strong tides pose their own challenges.

Vervoer

Renovation of the railway culvert

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a railway culvert.

Vervoer

Retention tanks for the railway station

The modernisation of the Warsaw West railway station is the largest construction project currently underway in the Polish capital.

Vervoer

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks

Vervoer

Lightening structure of the General Road viaducts

Use of polyethylene pipes in the construction of viaducts of the Generals’ Route not only helped to lighten their structures but also lowered project cost.