Sustainable solution for a pulp & paper mill, Nymölla, Sweden
Sustainable solution for a pulp & paper mill
Nymölla Bruk in Skane, Sweden, is a modern pulp and fine paper mill which is part of the Stora Enso Group’s division called Stora Enso Paper. Nymölla Bruk manufactures uncoated fine paper: document paper and paper for envelopes and printing.
Fakty o projekcie:
Zaangażowanie Uponor
The old outfall pipe, which was installed in 1961, was made of wood. It had begun to break in some places and was springing leaks. The bands around the pipe had rusted and begun to crack after many years of friction against the seabed, and the related maintenance costs were increasing. As a result, Stora Enso decided to replace the outfall pipe. Stefan Johansson, a Construction Project Manager at Nymölla Bruk, contacted Uponor Infra during the marine installation of a stormwater pipe for the Glasbruket housing area in Limhamn. In the Limhamn project, no external concrete weights were used for sinking the pipes. A patented profile filling method was used instead.
A patented method for sinking the pipes
“Nymölla was very interested in avoiding the use of external concrete weights, because fishing activities occur in the area. Weholite was chosen because it could be profile-filled with grout. This was a crucial factor when choosing Uponor,” says Stefan Johansson. Nymölla chose Weholite for the new pipe due to its ability to withstand external wear such as friction against the seabed, which was so advantageous that alternatives were ruled out. In all, 3,500 metres of Weholite dimension DN/ID1,500mm were installed, consisting of 24-metre sections of pipe.
A dedicated team
“The project has involved several challenges, the greatest of which was the weather and ensuring that the old pipe would continue to function as the new one was being installed. In addition, connecting the new pipe could take no longer than 5 hours.” “In collaboration with us, Uponor Infra Project Services managed to handle all these challenges. Uponor Infra’s project service team is very dedicated, competent, perceptive, reliable and fun to work with. They clearly like their job and enjoy working together,” Stefan Johansson concludes. Uponor Infra Project Service’s work involved drawings, calculations of stability, corrosion and hydraulics, as well as project management and job descriptions. The field service work consisted of detailed engineering, project management, welding pipes into 265-metre sections, profile-filling by using the Uponorpatented method, and the monitoring of sinkings. No external concrete weights were used for sinking the pipes.
A patented method for sinking the pipes
“Nymölla was very interested in avoiding the use of external concrete weights, because fishing activities occur in the area. Weholite was chosen because it could be profile-filled with grout. This was a crucial factor when choosing Uponor,” says Stefan Johansson. Nymölla chose Weholite for the new pipe due to its ability to withstand external wear such as friction against the seabed, which was so advantageous that alternatives were ruled out. In all, 3,500 metres of Weholite dimension DN/ID1,500mm were installed, consisting of 24-metre sections of pipe.
A dedicated team
“The project has involved several challenges, the greatest of which was the weather and ensuring that the old pipe would continue to function as the new one was being installed. In addition, connecting the new pipe could take no longer than 5 hours.” “In collaboration with us, Uponor Infra Project Services managed to handle all these challenges. Uponor Infra’s project service team is very dedicated, competent, perceptive, reliable and fun to work with. They clearly like their job and enjoy working together,” Stefan Johansson concludes. Uponor Infra Project Service’s work involved drawings, calculations of stability, corrosion and hydraulics, as well as project management and job descriptions. The field service work consisted of detailed engineering, project management, welding pipes into 265-metre sections, profile-filling by using the Uponor patented method, and the monitoring of sinkings.
Informacje o projekcie
Informacje o projekcie
Partnerzy
Podobne projekty
Transport solanki - rurociągi technologiczne
Rurociągi technologiczne transportujące solankę wypłukiwaną podczas budowy podziemnego magazynu gazu i dalszy jej zrzut do Zatoki Puckiej.
Rurociągi derywacyjne dla MEW
Renowacja rurociągów solankowych
Transport wód nadosadowych, KGHM
Pozytywne doświadczenia KGHM Polska Miedź S.A. z transportu odpadów poflotacyjnych zadecydowały o podjęciu decyzji o zastosowaniu systemów PEHD do transportu wód nadosadowych ze zbiornika odpadów poflotacyjnych.
Systemy drenażowe składowiska Żelazny Most, KGHM
Od prawie 20 lat Uponor Infra wspiera polskiego giganta przemysłu wydobywczego, KGHM Polska Miedź S.A., w modernizacji największego w Europie zbiornika odpadów poflotacyjnych.
Transport odpadów poflotacyjnych, KGHM
Uponor Infra od wielu lat spełnia najwyższe standardy jakości KGHM dostarczając koncernowi wysokiej jakości systemy rurociągowe PEHD do transportu wód technologicznych i szlamu.
Systemy odwodnień kopalni
Firma Uponor Infra od kilkunastu lat dostarcza systemy PEHD do odwodnienia powierzchniowego kopalni węgla brunatnego
Budowa rurociągów wody surowej dla elektrowni
Systemy drenażowe dla elektrociepłowni
Moduły przeciskowe typu drenarskiego VipLiner produkcji Uponor Infra zostały wykorzystane do budowy sieci drenarskiej w gdyńskiej elektrociepłowni.
FishGLOBE ferma rybna w Norwegii
Wehoslurry rozwiązuje problem elektrowni
Waste water treatment development in Ishøj industrial area
Uponor delivers tanks for a ground-breaking development project at Vestforbrænding
A durable and reliable solution for wastewater
Weholite yields savings and smoother implementation
New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.
Record-breaking intake cooling system in the Philippines
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Power boost for Stockholm’s district heating network
A new generation biotechnology factory
Extension of the district cooling station seawater intake in Helsingborg, Sweden
The district cooling system in Helsingborg involves the streamlining of current production. By means of seawater and using heat from the district heating network to power an absorption cooling unit, district cooling provides much better environmental values than electric cooling units. The district cooling station is an efficient source of cooling for buildings, industrial facilities and shopping centres.