Füllen Sie den BIM Warenkorb aus dem Produktkatalog
Unsere Kundenservice-E-Mail-Adresse hat sich geändert. - Überblick

Referenzübersicht

395 Ergebnisse
Mehrfamilienhaus

321 West Sixth Street, Austin, TX

The second-largest high rise in Austin's central business district required a plumbing solution that delivered installation speed and unmatched quality. Austin-based The Porter Company chose Uponor PEX-a and Kitting Services to decrease overall installation time, speed up the planning process, and facilitate quicker construction start times.

Industriegebäude

Drake Plastics Manufacturing Facility

An existing structure with plans to become an industrial manufacturing facility needed a reliable plumbing solution that would integrate with the building’s current system and be fast to install. Graves Mechanical chose Uponor hybrid products with innovative, one-step transitions for faster, easier installs along with the benefit of onsite support.

Mehrfamilienhaus

Waterline

A mixed-use, commercial and residential supertall skyscraper in Austin – the tallest building in Texas – needed a sustainable heating and cooling solution for a hotel lobby with soaring ceilings as well as a durable, corrosion-resistant domestic water system that could last for decades.
 
Mehrfamilienhaus

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.

Mehrfamilienhaus

Residential Complex "SVITLO PARK"

SVITLO PARK” is a large-scale residential complex in the “city within a city” format, located on more than 20 hectares on the right bank of the Dnipro River in Kyiv. The project combines modern architecture, social infrastructure (kindergartens, school, child development centre, sports club), and car-free pedestrian green spaces.

Kulturelle Einrichtungen

Minnesota Zoo Built Safe Walkways with an Uponor Snow Melt System

Installed in 2015, the Uponor snow and ice melting system at the Minnesota Zoo enables safe, year-round accessibility for guests by eliminating the need for constant snow removal. Designed to withstand harsh Minnesota winters, the hydronic system continues to help the zoo maintain consistent operations while protecting guests, staff, and infrastructure, even after more than a decade of use.
 
Mehrfamilienhaus

Luxury High-Rise Benefits from Uponor PEX

Because of its alignment with the bustling culture of innovation in nearby New York City, the developer for 99 Hudson in Jersey City, N.J., wanted a plumbing solution that offered long-standing quality and reliability while the installing contractor required a system that offered the most efficient installation possible to maximize profitability. An Uponor AquaPEX® plumbing system with ProPEX® fittings met both needs to provide a durable, reliable, and efficient domestic-water system for the unit risers and in-suite plumbing.
Mehrfamilienhaus

Journal Squared

A three-tower residential, retail, and office complex needed a plumbing solution that enhanced sustainability and offered a simplified installation method. 

(photo credit: Tatiraju Rishabh)
Mehrfamilienhaus

PEX Drives Efficient In-Slab High-Rise Install

ACCO Engineered Systems sought a plumbing solution that could be installed in a concrete slab to allow for higher ceilings in the residential units. This type of installation had never been done before by any other plumbing contractor in the city of Los Angeles. Going into the project, they knew they had a tight installation timeline of plumbing one 16-unit floor per week and needed a system that facilitated a quick installation while maintaining reliability. The plumbing subcontractor, ACCO, also wanted a strong product warranty for added confidence. They have a long history record and are well versed in high-rise installations, so they wanted a brand that offered support throughout the entire construction cycle to help ensure a smooth installation from start to finish.

Bürogebäude

Bahnhofpark, Sargans

A modern approach to working, living and shopping - Bahnhofpark in Sargans, Switzerland has it all.

Sportanlagen

Stades de Bienne - Tissot Arena

 

The Stades de Bienne gives Biel a brand-new, versatile meeting point for sport, culture, business, eating and shopping and is attracting visitors from all over the region. Due to open in 2015, Uponor AG Schweiz has contributed to this project by providing thermoactive building component systems (TABS).

Einkaufszentren

Royalmount

As developer Carbonleo designed Royalmount in Mount Royal, Québec, they created a pedestrian-oriented space that prioritized sustainable landscape, public transit access, and active mobility. Royalmount became an eco-community that seamlessly integrates nature throughout its indoor-outdoor design, offering a unique blend of experiential attractions, retail stores, office spaces, and accommodations that are rooted in restoration and environmental consciousness. Because Québec experiences intense winters with unpredictable amounts of snow and ice, Carbonleo needed a solution to heat the outdoor sidewalks, allowing guests to enjoy the facility safely during winter while also protecting the outdoor greenery.  

Uponor Referenzmagazin

Uponor Referenzmagazin

Smart. Connected. Innovation. Innovative Referenzen rund um die Welt, gesammelt in einem Dokument! Stöbern Sie jetzt durch die Uponor Referenzen!

PDF 5 MB