Tapaustutkimus

City Hall, Haderslev, Denmark

A flexible waterfront building

Built in 2013/14, the atrium building with a panoramic view features architectural finesse in a future-oriented waterfront environment. In 2014, it was awarded the German Design Award in the "Architecture and Urban Space" category. Its 360° design offers a clear view of the city and the harbour. With a total area of 8,600 m2, the building houses a variety of educational facilities, offices and meeting rooms over five floors.
 
A building of this size with large glass surfaces and open floor plans makes it difficult to manage comfort and energy consumption simultaneously. Although the energy statistics were already in a good range, there was still room for improvement.

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.

Projektin tiedot

Haderslev, Denmark
Toimisto- ja liikerakentaminen
Lattiatila: 8,600
Valmistuminen: 2021
Kerrosluku: 5

Uponorin osallistuminen

Installation of clamp-on sensors; AI and remote optimisation analysis – gaining meaningful and actionable insights from easy-to-read visualisations to improve the heating and cooling system.

Innovative improvements in an inspirational environment

After the installation of the clamp-on sensors, significant volumes of data were analysed to gain meaningful insights from simple visualisations. With an energy consumption of 141 kWh/m2/year, i.e. 376,920 kWh/year, there was still room for improvement. The data obtained gave us insights into electricity usage, heating and cooling, and comfort plans.
 
Power
Electricity consumption was at a high idle level. The ventilation system was active outside of business hours, and the temperature provided by the air heating ceiling was too high.
 
Heating / cooling
The poor cooling of the district heating system led to very high consumption, and the radiators had to be adjusted on all floors.
 
Comfort
The CO2 sensors required recalibration.

Solution
The built-up area of the building amounts to 1,472 m2 per all 5 floors. Because of the open architecture, there are no walls to insulate the individual floors.
Based on the findings obtained with our sensors, we estimated that the ground floor requires 100% heating. The remaining 4 floors, however, only require 20%. Using this calculation, the total heating area of 8,600 m2 decreased to 2660.4 m2.
Consequently, the energy consumption dropped from 376,920 kWh per 2660.4 m2 square metre to 141.7 kWh/m2.

Savings 
Optimisation of the building's heating, cooling and ventilation systems resulted in the following savings:
  • 311,084 kWh/year
    (combined heating / cooling and electricity)
  • € 27,000/year
  • 15.8 tonnes CO2/year
  • ROI: 3 months
  • Weather-dependent heating control enabled a further energy efficiency potential of 15%
City Hall gallery
CH1

Projektin tiedot

Projektin tiedot

Osoite
Christian X's Vej 39, 6100 Haderslev
Maa
Denmark
Verkkosivu
https://www.haderslev.dk/forside/
Valmistuminen
2021
Projektityyppi
Remontti
Rakennustyyppi
Toimisto- ja liikerakentaminen

Yhteistyössä mukana

Yhteistyössä mukana

Client: Haderslev Kommune

Architects: AART & Zeni Arkitekter

https://aart.dk/en/projects/vuc-syd

Samankaltaisia projekteja

Helilän koulu

Helilän koulu

Helilän koulun väistötilat ovat puurakenteisia, siirrettäviä tilaelementtirakennuksia, jotka tuodaan työmaalle valmiina elementtilohkoina. Väistötilojen lattialämmitystä ohjetaan Uponor Base PRO -säätölaitteilla, jotka on yhdistetty taloautomaatiotekniikkaan.
Päiväkoti rakentuu energiapaaluilla

Päiväkoti rakentuu energiapaaluilla

Vaaralanpuiston päiväkodin toteutus perustuu Vantaan kaupungin toimeksiannosta lähes 0-energiapäiväkonseptin pohjalta laadittuihin suunnitteluohjeisiin. Päiväkodin rakennustyöt alkoivat loppukesästä 2016 ja hanke valmistuu heinäkuussa 2017. Hankkeen kustannusarvio on 5,4 miljoonaa ja päiväkoti on mitoitettu noin 130 lapselle. Eri energiantuottovaihtoehdoista Vantaan kaupunki valitsi kohteeseen Uponorin ja Ruukin yhteistoimituksena energiapaalu- sekä aurinkokeräinjärjestelmän.
HAMKin nollaenergiahalli hyötyy energiapaaluista

HAMKin nollaenergiahalli hyötyy energiapaaluista

Suomen ensimmäinen lähes nollaenergiahalli valmistui Hämeenlinnaan toukokuussa 2015. Hämeen ammattikorkeakoulun (HAMK) Ohutlevykeskus-tutkimusyksikön käyttöön rakennettu halli ottaa käyttöenergiansa pääasiassa energiapaaluista ja aurinkopaneeleista.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Uponorin uuden pääkonttorin lattialämmitykseen vaadittiin lattiarakenteiden korkotason vuoksi ratkaisu, joka nostaisi lattiapintaa mahdollisimman vähän. Toimiva lopputulos saatiin aikaan tavanomaisesta poikkeavalla toteutuksella, pientalojen saneerauksissa pääosin käytettävillä, matalarakenteisilla lattialämmityslevyillä, jotka nostavat lattian korkeutta vain 15 millimetrillä.
Bayer Qingdao ECB Lighthouse

Bayer Qingdao ECB Lighthouse

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program.
Klimahaus Bremerhaven 8°

Klimahaus Bremerhaven 8°

The Klimahaus Bremerhaven 8° Ost in Germany is a science centre that presents climate and climate change topics in a comprehensible scientific manner.
Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Energy Efficiency Center

Energy Efficiency Center

The foyer, information centre and conference room at the Energy Efficiency Centre in Würzburg uses the Uponor Klett line for energy-efficient radiant heating and cooling.
Ericusspitze Spiegelhaus

Ericusspitze Spiegelhaus

New company HQ of the Spiegel Group is located at the Ericusspitze. The concrete core activation from Uponor ensures pleasant temperature levels in the building.
Kranhaeuser

Kranhaeuser

Fantastic, modern architecture directly on the Rhine in Cologne - the Kranhaus buildings
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

Leitradlofts, Cologne

Leitradlofts, Cologne

A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Palazzo Ferrazzi - Brescia

Palazzo Ferrazzi - Brescia

Uponor brings the comfort of its Underfloor Heating & Cooling to a prestigious renovation project to transform a Norther Italy 1700s Palace into comfortable offices
Posco Green building

Posco Green building

POSCO Green Building located on the Yonsei University International Campus in Songdo,  has been equipped with radiant underfloor heating and cooling and Comfort panels from Uponor.
National Library of Latvia

National Library of Latvia

National Library of Latvia is the most impressive industrial project in Latvia of the last decade. Uponor provided the building with Uponor underfloor heating and MLCP pipes.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
BAE Systems Rochester

BAE Systems Rochester

BAE systems are the third largest global defence company, delivering a range of products for the air, land and naval armed forces.
Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria. 
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Villeroy & Boch

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.
Poslovni centar Adris grupe

Poslovni centar Adris grupe

Arhitektonski projekt poslovnog centra Adris u Jagićevoj ulici 33. u Zagrebu, spoj je klasičnog i modernog. Gradnja poslovnog centra započeta je 2011., a završena 2015. kada se u nju smještaju zaposlenici Adris grupe i Croatia osiguranja. 
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.