eMAG Warehouse, Joita, Romania

Uponor & eMAG take a step forward towards sustainable industrial heatin

Uponor took another step towards sustainable radiant heating after providing an optimal heating solution for a logistics warehouse that was, at the time of opening, the largest in South-East Europe.
The challenge of the eMAG beneficiary turned into a project designed for the future, with long-term optimized costs.
The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.

From challenging to pioneering
How do you heat a hall of over 120,000 m² sustainably, reducing operational costs by making monthly energy consumption more efficient?
The challenge began in 2018, with the construction of the first eMAG warehouse, which was a pioneer for industrial floor heating.
Conventional solutions meant heated air mounted on the roof. Warm air rises, so a higher temperature would have been needed to heat a huge hall at ground level. This means high energy costs.
An area of 120,000 m², equivalent to more than 10 football pitches, needs sustainable solutions for air conditioning, which are functional and efficient, from an energy point of view, for a long period of time.

Optimizing materials by heating active surfaces
If until then industrial floor heating meant activating the entire surface, for the eMAG warehouse, Uponor, together with a team of designers, came up with a solution specially designed for a huge space of 120,000 m²:

The heated areas are the extremities and other areas totaling another 40 - 45 square km, which distribute a homogeneous temperature throughout the hall.


The Uponor team involved in the project:
Ana Trifan Diaconu - Project Area Sales Manager & Design Support
Mihai Istoc - Area Sales Manager Uponor Bucharest
Razvan Dieaconu - Technical Support Engineer
Uponor Poland, PDC division - engineering center providing expertise for complex projects.
 

Коротко про проєкт

Joita, Romania
Будівлі промислового призначення
Рік завершення будівництва: 2021

Вклад Uponor

130 000 meters of pipe | Magna industrial heating system | Q&E system

From challenging to pioneering
How do you heat a hall of over 120,000 m² sustainably, reducing operational costs by making monthly energy consumption more efficient?
The challenge began in 2018, with the construction of the first eMAG warehouse, which was a pioneer for industrial floor heating.
Conventional solutions meant heated air mounted on the roof. Warm air rises, so a higher temperature would have been needed to heat a huge hall at ground level. This means high energy costs.
An area of 120,000 m², equivalent to more than 10 football pitches, needs sustainable solutions for air conditioning, which are functional and efficient, from an energy point of view, for a long period of time.

Optimizing materials by heating active surfaces
If until then industrial floor heating meant activating the entire surface, for the eMAG warehouse, Uponor, together with a team of designers, came up with a solution specially designed for a huge space of 120,000 m²:

The heated areas are the extremities and other areas totaling another 40 - 45 square km, which distribute a homogeneous temperature throughout the hall.

 

Інформація про проєкт

Інформація про проєкт

Країна
Romania
Рік завершення будівництва
2021
Тип будівлі
Будівлі промислового призначення
Продуктові лінійки
Q&E, uponor.productline.title.8582d55b-d834-4a01-ab00-4fcf1b138396, Magna

Партнери

Bauprojekt Team

Подібні проєкти

Обласний перинатальний центр

Обласний перинатальний центр

Національний проект «Нове життя – нова якість охорони материнства та дитинства» реалізує Державне агентство з інвестицій та управління національними проектами. Проект запроваджений з ініціативи Президента України Віктора Януковича та втілюється за сприяння Міністерства охорони здоров’я України, Національної академії медичних наук України, місцевих органів самоврядування та Всеукраїнської благодійної організації «Фонд Віктора Пінчука – соціальна ініціатива».
Plastic pipe withstands mill’s process water

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.