Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

The Opera House in Copenhagen, Copenhagen, Denmark

The Opera House in Copenhagen

Коротко про проєкт

Copenhagen, Denmark
Будівлі промислового призначення
Поверхневе опалення/охолодження
Рік завершення будівництва: 2005

Вклад Uponor

3000
In January 2005 the new Copenhagen Opera House was inaugurated. The spectacular and complicated building construction, which total area is 41,000 m2 divided in 14 stories, had several challenges.


One of them was when Uponor in a close cooperation with Rambøll, the leading engineering, design and consultancy company in the Nordic countries, accomplished the project engineering and installation of underfloor heating and cooling in the Opera's foyer. The goal was to create a pleasant indoor temperature both for summer and winter – with just the one system. In addition, the aesthetic and architectural requirements were to be considered, not to mention external factors like sun and emission of heat from over one thousand opera guests.


Uponor's manager for technical support, Jan Skjold Sørensen, described the task as follows: "Under normal circumstances it would not have been especially complicated to utilise a combined solution for underfloor heating and cooling. But Opera's foyer is far away a normal room partly due to its size but also due to the several architectural and aesthetic requirements. The balcony in the foyer is special and thin compared with standard sizes and tolerances, making special demands for a heating and cooling solution. The solution needed also to be a dynamic one, as a huge change in the temperature would take place when 1,400 persons enter the foyer simultaneously. Therefore the underfloor cooling should cool down the constructions and thus prevent the indoor temperature from becoming too high, because the air humidity would then increase and following this, the risk of damp and condensation is high. In the colder months, when there is need for heating of the foyer, the underfloor heating takes over”.


Possible solutions were discussed and tested by Rambøll and Uponor. Once a solution was decided on, a phase planning took place in order for the installation people to enter the construction site when it was suitable The installation work itself was rather frictionless, the biggest challenge being logistic – the unbreakable flow of the 18,000 metres pipe in a construction site including hundreds of craftsmen.


Thanks to Uponor’s heating and cooling system, nobody should be either cold or too warm when enjoying a drink or a sandwich in the enormous foyer. "To control the temperature when up to 1,400 people stand together on a 3,000 m2 floor area was a challenge – taking big windows, airflow from windows and doors, lights in the room, design and other parameters into consideration – but we made it", states Jan Skjold Sørensen gladly.
 

The Opera House in Copenhagen

0001748

Інформація про проєкт

Інформація про проєкт

Адреса
Nyhaven 71
Країна
Denmark
Рік завершення будівництва
2005
Тип проєкту
Референс об'єкти
Тип будівлі
Будівлі промислового призначення

Партнери

Партнери

contractor
Rambøll
Rambøll Danmark Bredevej 2 2830 Virum
Denmark

Подібні проєкти

Обласний перинатальний центр

Обласний перинатальний центр

Національний проект «Нове життя – нова якість охорони материнства та дитинства» реалізує Державне агентство з інвестицій та управління національними проектами. Проект запроваджений з ініціативи Президента України Віктора Януковича та втілюється за сприяння Міністерства охорони здоров’я України, Національної академії медичних наук України, місцевих органів самоврядування та Всеукраїнської благодійної організації «Фонд Віктора Пінчука – соціальна ініціатива».
Plastic pipe withstands mill’s process water

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.
eMAG Warehouse

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.