Uponor International Sales
Industriestrasse 56, 97437 Hassfurt, Germany
References

Renovation of the railway culvert, Kraków Płaszów, Poland

Renovation of the railway culvert at Kraków-Płaszów station

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a culvert (originally a two-span vaulted brick bridge on stone and brick supports over a watercourse) under railway line 91 (E30) near the Kraków Płaszów station. The work was carried out by Strabag Sp. z o.o. as part of the task entitled “Works on the E 30 railway line on the Kraków Główny Towarowy - Rudzice section and the addition of the agglomeration line tracks. SECTION 5 – Kraków Płaszów station". 

Project facts

Kraków Płaszów, Poland
Transportation
Renovation
Completion: 2021

Uponor Involvement

Weholite pipes PEHD DN3000 SN8 - 40 m
Connection of pipes by extrusion welding by the Uponor Infra Service Group

Renovation in hard-to-reach terrain

The renovated building, measuring 5.66m x 3.60m, had a brick structure and was in need of comprehensive restoration due to its inadequate insulation, severe leaks, seepage, mould and fungal efflorescence and a corroded and cracked vault. After a reconstruction probably carried out in the inter-war or early post-war period, it served as a pass-through chamber for the city's rainwater drainage system, crossing the railway tracks towards the Bagry reservoir. The railway line just above the culvert has seven pairs of tracks. The length of Weholite DN3000 pipes supplied for the refurbishment in L=10m sections was 40m in total, and they were joined by the Uponor Infra service team using extrusion welding technology. The free space between the old structure and the new PEHD pipe was injected with fill of suitable strength to stabilise the new culvert.

Thanks to the efficient execution of the work, as well as the properly coordinated delivery of Weholite pipes and the service work carried out by Uponor Infra, the facility has been adapted to its intended function of acting as a large cross-section rainwater sewer section, routing rainwater across the track system. The task was not easy due to, among other things, the rather difficult terrain, the need to ensure the continuity of rail traffic, the limited installation space for the new pipes, the work at considerable depth and the need to ensure the by-pass flow of incoming rainwater. Despite many restrictions and limitations, Weholite pipe technology has once again proven to be reliable and the most optimal of many others available on the market, and the strategic and responsible facility has been given a “second life” from a technical point of view.

Renovation of the railway culvert

Renovation of the railway culvert

Project information

Project information

Country
Poland
Completion
2021
Building Type
Transportation
Product lines
Weholite for gravity renovation

Partners

Partners
Investor:
PKP Polskie Linie Kolejowe S.A.. (PKP Polish Railways)

General contactor:
STRABAG Sp. z o.o.

Similar projects

Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Retention tanks for the multimodal terminal

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.
Modernization of the lock on the barrage

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.