Tapaustutkimus

South Kilburn residential site, South Kilburn, London, United Kingdom

Uponor upgrades district Heating network at South Kilburn residential site

The multi-residential properties Swift House and George House in South Kilburn, London, were in need of new pipes to connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.
This upgrade was required as the existing pipes were leaking, making the heating system both inefficient and ineffective. As well as supplying the new pipes that would fix the leaking, Uponor also played a pivotal role in devising an installation process which would significantly minimise disruption to the residents.

Projektin tiedot

South Kilburn, London, United Kingdom
Kerrostalo
Eristetyt Ecoflex-putkistot, Komposiittijärjestelmä
Valmistuminen: 2021

Uponorin osallistuminen

Resolved leaking district heating network with the use of Ecoflex Thermo; 300 metres of Uponor’s Ecoflex Thermo pipes were used to create the temporary connection and then a further 283 metres of piping was installed in the underground trenches where the previous pipes lay.
The insulation and design of Ecoflex Thermo minimised heat and energy losses, making it highly efficient system which reduced energy wastage and minimised heating costs.
Minimised disruption to the site’s residents while swapping out the old pipes for the new. The results was that no residence was cut off from the heating network for any longer than 12 hours.

Uponor upgrades district heating network at South Kilburn residential site

300 metres of Uponor’s Ecoflex Thermo pipes were used to create the temporary connection and then a further 283 metres of piping was installed in the underground trenches where the previous pipes lay. These new pipes connected the district heating network to the ground floor communal areas, service areas and to the building’s main risers. Uponor’s multi-layer composite pipes (MLC) were used to connect the risers, also supplied by Uponor, to the heat interface units (HIU) that were already installed in the apartments.

John Twumasi, Managing Surveyor at Bouygues UK, said: "We replaced the existing pipes with the Uponor specified products, as these are proven to be much more durable and therefore would be able to maintain a reliable, effective long-term supply of heating and hot water. We were particularly impressed with how robust the pipes were, which would help to avoid future leaks below ground.

It was important to complete this project as safely and quickly as possible to meet the client’s requirements. To achieve this, not only would the quick, easy-to-install nature of Uponor’s solutions be a benefit, but Uponor worked on a strategy that would drastically reduce the amount of time the heating and hot water would be turned off for residents.
This strategy involved firstly installing a temporary above-ground network of pipes and then connecting them to parts of the above ground network which did not require replacement. Once the temporary pipes were connected to maintain heating and hot water, the redundant underground pipes were then dug out and replaced with the new Uponor pipework."

In addition to the robust, reliable nature of Uponor’s pipes, they can also be easily cut-to-length, helping to simplify and speed up the refurbishment project further. The modular connection on Uponor’s risers also helped to streamline the work, as this made it easy to connect and change the pipes.

Uponor coordinated the work so that it could be done quickly and efficiently despite the tight working spaces. This efficiency was essential in order to get the new main line from the plant room operational as soon as soon as possible after the old line had been turned off. The result was that no residence was cut off from the heating network for any longer than 12 hours.

Despite careful planning to ensure that all materials were onsite and ready when required, Uponor’s logistical abilities were tested by the fact that phase two of the project took place during the first COVID-19 lockdown. Despite this, thanks to its robust supply chain, the team was able to ensure the reliable delivery of materials throughout the project. The team also conducted strict risk assessments and developed new onsite operating procedures to ensure that the project could continue to be delivered in a COVID-secure manner.

Benefit
The flexibility of Ecoflex Thermo means that it can be used to connect a decentralised plant room or energy centre to a building without joints, as the pipe can be laid over bumps or around obstacles which for alternative systems would require multiple connections. This design advantage makes the system much more reliable as it eliminates weak points where leaks can occur.
The insulation and design of Ecoflex Thermo minimises heat and energy losses, making it a highly efficient system which reduces energy wastage and minimises heating costs.

Uponor’s design services and logistical support ensured that the project ran smoothly and provided peace of mind in the long term reliability of the site’s heating network.

  “We’ve worked previously with Uponor and knew that they were up to the task. The Uponor team performed site surveys and looked at the situation well in advance in order to come up with a plan that would solve the site’s issues. Throughout the project, Uponor provided ongoing help and support to address the health and safety, and logistical issues associated with carrying out pipework replacement work while ensuring very minimal disruption of services to residents.”
John Twumasi, Managing Surveyor at Bouygues UK

Projektin tiedot

Projektin tiedot

Maa
United Kingdom
Valmistuminen
2021
Projektityyppi
Remontti
Rakennustyyppi
Kerrostalo

Yhteistyössä mukana

Yhteistyössä mukana
Main Contractor:
Bouygues UK
Developer:
L&Q Group

Samankaltaisia projekteja

Lattiaviilennyksellä lisäarvoa uudiskohteeseen

Lattiaviilennyksellä lisäarvoa uudiskohteeseen

Tampereen keskustassa sijaitseva vanha Postitalo sai vuonna 2017 uuden ilmeen kun vanha rakennus remontointiin uusiksi liiketiloiksi ja päälle rakennettiin kerrostalo. Asuinhuoneistoihin asennettiin lämmönjakojärjestelmäksi Uponorin lattialämmitys ja -viilennysjärjestelmä.
Lahdessa Aleksanterinkatu 5 valmistuu talotekniikkahormeilla

Lahdessa Aleksanterinkatu 5 valmistuu talotekniikkahormeilla

Lahdessa entisen pankin kortteliin nousee 8-kerroksinen kerrostalo, johon tulee yhteensä 265 asuntoa. Talossa oleviin opiskelija-asuntoihin asennettiin Uponorin  talotekniikkahormit kylpyhuone-elementtien yhteyteen sekä keittiön hormeiksi. Aleksi 5 on ensimmäinen uudiskohde, johon toimitettiin talotekniikkahormit ja joissa on käytetty ääntä vaimentavaa Decibel-viemäriä.
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Next stop: comfort

Next stop: comfort

For the conversion of the historic building, the planners relied on decentralized apartment stations from KaMo and floor heating and cooling from Uponor.
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Riverstone Residence

Riverstone Residence

Multi-storey building in Kipsala in the historic centre of Riga and UNESCO World Cultural and Natural Heritage Protection Zone.
Eco Housing Estate

Eco Housing Estate

A multi-use housing estate with a total area of 73,000 sq. m including three residential buildings and office premises.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Fairway Village

Fairway Village

Learn how the challenge of replacing 45-year-old underground plumbing, heating and cooling system in an...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Loring Park Tower

Loring Park Tower

See how this Minneapolis Mechanical Contractor witnessed significant decrease in jobsite labor during Uponor PEX...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.