Tapaustutkimus

Next stop: comfort, Bad Salzungen, Germany

Next stop: comfort

The municipal housing company GEWOG and the city of Bad Salzungen are redesigning the entire train station area in the spa town. The site includes a historic train station building. After the renovation, a social center will move into the first floor, and 13 apartments will be built on the upper floors and in the attic. To ensure that the future tenants are as comfortable as possible, the choice fell on decentralized apartment stations from KaMo and a combination of different systems for surface heating and cooling from Uponor.

Projektin tiedot

Bad Salzungen, Germany
Kerrostalo
Lattialämmitys ja -viilennys, Komposiittijärjestelmä
Valmistuminen: 2020

Uponorin osallistuminen

13 Home stations
7 drinking water stations
650 sqm Uponor Klett | 800 sqm Uponor Contec ON | 200 sqm Uponor Renovis

Reconstruction and redevelopment of the station area

Decentralised flat stations

The decentralised heat distribution in each flat is handled by a flat combination station with a 3-pipe module. The advantage is that the drinking water is heated promptly and according to demand. The temperatures - and thus also the operating costs - are lower than with central systems. Because there are less than three litres of water in the hot water pipes, there is no obligation to test for legionella. More distant taps in seven flats are each supplied by an Aqua Port Compact Base drinking water station.


Surface heating and cooling

Depending on the room height, use and type of construction, different systems are used for surface heating and cooling on the individual floors. For the social centre on the ground floor with its four-metre high rooms, the Uponor Klett underfloor heating system was ideal. For the upper floors with solid concrete ceilings, the specialist planners planned a near-surface component activation with the Uponor Contec ON system. The dry construction system Uponor Renovis is ideal for the wooden ceilings in the attic. Consultants from KaMo and Uponor were on hand to assist the planners, right through to special designs specifically for this building project.



"With the systems from Uponor and KaMo, we were able to optimise three factors at once: living comfort, drinking water hygiene and energy costs," specialist planner Harald Kirchner.

Next stop: comfort

Referenz Bad Salzungen

Projektin tiedot

Projektin tiedot

Osoite
36433 Bad Salzungen
Maa
Germany
Verkkosivu
https://www.badsalzungen.de/de/bahnhofsareal/bahnhofsareal.html
Valmistuminen
2020
Projektityyppi
Remontti
Rakennustyyppi
Kerrostalo
Tuotelinjat
Renovis, Klett, Contec ON

Yhteistyössä mukana

Yhteistyössä mukana

Builder-owner:
GEWOG GmbH Bad Salzungen
https://www.gewog-basa.de/

Architect:
S&P Sahlmann Planungsgesellschaft für Bauwesen mbH Leipzig
https://sup-gruppe.com/

Construction:
Ingenieurbüro Kirchner (IBK Haustechnik) Bad Salzungen
https://ib-kirchner.de/

 

Samankaltaisia projekteja

As Oy Ulvilantie 12

As Oy Ulvilantie 12

Helsinkiläiseen vuonna 1962 rakennettu asuinkerrostaloon tehtiin vuonna 2018 linjasaneeraus, vanhat putket korvattiin Uponor Reno Port -talotekniikkakasetilla, joka sisältää käyttövesiputket, pystyviemärin ja seinä-wc:n sekä vesi- ja viemäriliitännät viereen asennettavaa pesuallasta varten.
Fiksu ratkaisu reititykseen

Fiksu ratkaisu reititykseen

Helsingin Jätkäsaareen rakennettavaan kerrostaloon asennettiin Riser Port -hormiratkaisu, jonka avulla nousulinja voidaan koota ketterästi ja nopeasti.
As Oy Petreliuksenrinne

As Oy Petreliuksenrinne

As Oy Petreliuksenrinne on vuonna 1969 valmistunut asuinkerrostalokokonaisuus. Yhtiössä on 124 asuntoa, joiden saneerauksen lähtökohtana oli korjata vesi- ja viemärijärjestelmät. Lisäksi saneerattiin pohjaviemärit, kylpyhuoneet, sähkönjakelu ja antennijärjestelmä.
Sampo Oyj:n vuokrakerrostalojen saneeraus

Sampo Oyj:n vuokrakerrostalojen saneeraus

Sampo Oyj on valinnut vuokrakerrostalojen kosteidentilojen saneerauksen seinäratkaisuksi Uponor-tekniikkaseinän. Hanke alkaa maaliskuussa 2015 ja päättyy helmikuussa 2017. Kaikkiaan kohteissa on yhteensä 150 asuntoa.
Sokeritehtaantie 15

Sokeritehtaantie 15

Kirkkonummen Sokeritehtaantie 15:ssa valmistui kesällä 2015 kaksi vuokrakerrostaloa. Uudiskohteet toteutettiin Uponorin talotekniikkaelementeillä.
As Oy Varsta linjasaneeraus

As Oy Varsta linjasaneeraus

Kerrostalon linjasaneerausta voidaan nopeuttaa ja helpottaa merkittävästi. Uponor Reno Port -kasetilla saneerauksen urakointiaika lyhenee ja riskit pienenevät.
Lahdessa Aleksanterinkatu 5 valmistuu talotekniikkahormeilla

Lahdessa Aleksanterinkatu 5 valmistuu talotekniikkahormeilla

Lahdessa entisen pankin kortteliin nousee 8-kerroksinen kerrostalo, johon tulee yhteensä 265 asuntoa. Talossa oleviin opiskelija-asuntoihin asennettiin Uponorin  talotekniikkahormit kylpyhuone-elementtien yhteyteen sekä keittiön hormeiksi. Aleksi 5 on ensimmäinen uudiskohde, johon toimitettiin talotekniikkahormit ja joissa on käytetty ääntä vaimentavaa Decibel-viemäriä.
Lattiaviilennyksellä lisäarvoa uudiskohteeseen

Lattiaviilennyksellä lisäarvoa uudiskohteeseen

Tampereen keskustassa sijaitseva vanha Postitalo sai vuonna 2017 uuden ilmeen kun vanha rakennus remontointiin uusiksi liiketiloiksi ja päälle rakennettiin kerrostalo. Asuinhuoneistoihin asennettiin lämmönjakojärjestelmäksi Uponorin lattialämmitys ja -viilennysjärjestelmä.
As Oy Liedon Joutsen

As Oy Liedon Joutsen

Asunto-osakeyhtiö Liedon Joutsen on nelikerroksinen asuinkerrostalo, jossa on 18 tyylikästä kotia moderneilla mukavuuksilla. Yhtiö liitetään Liedon Lämmön kaukolämpöverkostoon, ja asunnoissa on Comfort Port -jakokeskuksilla varustettu Uponorin vesikiertoinen lattialämmitys.
As Oy Lakeankulma

As Oy Lakeankulma

Korkea laatu ja asumismukavuus olivat lähtökohtana myös talojen lämmitysratkaisuissa. Kaikkiin Lakeankulman 146 asuntoon on asennettu Uponorin vesikiertoinen lattialämmitys- ja viilennysjärjestelmä, joka on liitetty taloautomaatio-ohjaukseen.
KOy Goliathin salmi

KOy Goliathin salmi

Kahden puukerrostalon hanke käynnistyi keväällä 2018 ja odotetaan valmistuvan vuoden 2019 keväällä. Puukerrostalojen talotekniikka reititetään Reno Port -talotekniikkaseteilla.
Skyhouse

Skyhouse

Witness the premium customer experience during this hands-on support as this Austin Texas apartment complex converts...
Uponor participates in construction of Maarjamõisa Medical Campus

Uponor participates in construction of Maarjamõisa Medical Campus

2022 sees the completion of Maarjamõisa Medical Campus managed by Tartu University Hospital. The largest centre of its kind in Estonia, the Campus concentrates active medical care in one compact system. Uponor Estonia is participating as advisor, and as supplier of potable and heating water systems in the second construction phase currently under way.
LEO 250

LEO 250

"LEO 250" brings together sophisticated architecture and superb energy efficiency. Construction time was speed up due to the use of an Uponor systems.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Riverstone Residence

Riverstone Residence

Multi-storey building in Kipsala in the historic centre of Riga and UNESCO World Cultural and Natural Heritage Protection Zone.
Norman House Residential Development, Derby

Norman House Residential Development, Derby

To help address the housing shortage in Derby, an office block (Norman House) has been converted into 134apartments. As part of the conversion, electric heating, mains cold water distribution systems and hot water cylinders were installed in each room.

Avalon Bay

Avalon Bay

Six new apartment buildings, originally designed for CPVC, become a PEX project and include an Uponor Logic...
Tellico Village

Tellico Village

A recurring problem with pinhole-sized pipe leaks in copper required plumbing repair and repiping. Learn why the...
Aurora Micro Apartments

Aurora Micro Apartments

Learn why contractors chose to install an Uponor AquaPEX® plumbing system for these apartments based on product reliability and ease of installation...
Fairway Village

Fairway Village

Learn how the challenge of replacing 45-year-old underground plumbing, heating and cooling system in an...
Quail Hollow

Quail Hollow

See how a condominium complex replaces their leaking steel-pipe district energy system with Uponor’s Ecoflex pre-...
Loring Park Tower

Loring Park Tower

See how this Minneapolis Mechanical Contractor witnessed significant decrease in jobsite labor during Uponor PEX...
Multi-family homes

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
Episcopal Homes

Episcopal Homes

Uponor PEX saves time and labor on this multi-resident Midwest Senior Living home job in Burnsville, Minnesota...
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
hi! Cañaveral

hi! Cañaveral

hi! Cañaveral es una promoción VPPB excepcional con Climatización Invisible por suelo radiante Uponor.

Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.