Kontakt
Uponor Sp. z o.o.
ul. Kolejowa 5/7, 01-217 Warszawa
 

27 Znaleziono wyniki
Budynek przemysłowy

Uponor Annex

The newest $18M manufacturing expansion for Uponor PEX pulls out all the stops with a highly efficient building incorporating the company’s plumbing, radiant, and snow melt systems. 

Budynek przemysłowy

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.

Budynek przemysłowy

Würth Logistics Centre, Lithuania

Würth Logistics Centre is an exclusive build-to-suit project incorporating renewable energy sources.

Budynek przemysłowy

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 
Budynek przemysłowy

Airport Keflavik, Iceland

Keflavik International Airport private limited company with 100 percent government ownership 25 square kilometers area

Budynek przemysłowy

Bangkok Airport

An Uponor panel cooling system will cool Bangkok's new international airport in combination with a displacement ventilation system.

Budynek przemysłowy

Plastic pipes withstand factory process waters

Stora Enso's factories in Imatra, Finland were looking for a long-term solution for transporting hot process waters containing chemicals. The Weholite system proved to be a suitable solution.

Budynek przemysłowy

Plastic pipe withstands mill’s process water

Stora Enso’s Imatra mill, located in southeast Finland, annually produces one million tonnes of packaging paper and board. The Imatra mill’s two production units produce raw materials for cartons, in which juice and milk are packaged. Board is also used to produce paper cups, as well as cigarette and candy packages. Board for the graphics industry is used to produce cards, covers and luxury packages.

Budynek przemysłowy

In place in a couple of days

The waste water channel for the pulp line of the mill, which was renovated in 2017, was commissioned in the 1960s. Now there were fear that it would collapse. The new solution was Weholite.

Budynek przemysłowy

Chatterley Valley

The world's first BREEAM outstanding rated logistics building has been equipped with industrial floor heating from Velta UK.