Bayer Qingdao ECB Lighthouse, Qingdao, China
Bayer Qingdao ECB Lighthouse
ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program. The ECB Program is a global initiative to provide an all-in-one solution through collective work from Bayer and its network of building partners to meet demand in China and across the globe for creating highly efficient and cost effective commercial and public buildings.
Projektová fakta
Uponor participace
Bayer office is located in the Economic and Development processing Zone, and it is the city’s first zero-emission building. The 1,000 square meter complex holds 60 office workplaces and represents a building system where energy needs are covered through long-term efficiency gains and renewable energy generation.
The ECB lighthouse is a project where the fundamental functions, such as heating & cooling, lighting, hot water and ventilation, are all equipped with state-of-the-art technology to optimize energy usage, which recycles the building’s natural resources and utilizes solar energy for minimizing carbon emissions.
Aim of the ECB Lighthouse project is to provide building users with a high quality indoor climate with the lowest possible environmental impact and simultaneously reducing operation cost. Sustainable radiant cooling & heating systems are representing successful and interesting solutions to obtain and re-establish high comfort levels in offices. Their cooling & heating capacity is able to absorb/ cover all sensible loads inside the building and provide highly individual comfort. Therefore the air system can be reduced to provide fresh air at a minimum hygienic air exchange rate. This air system is also dehumidifying the space to cover the latent loads. So we can say goodbye to air systems with high flow rates and velocities which are the reason for local thermal discomfort.
Uponor Radiant Heating & Cooling Systems
Uponor Thermally-active Building System (TABS) Contec, In-situ concrete and OPTI Y were applied to the building. Our project team participated from the building design, installation, supervision to the commissioning progress. Project was completed in September 2012, and in operation till now.
Uponor TABS system (583m2 Contec modules installed) was applied to the building which prefabricated piping embedded into center of the concrete slabs performing heating and cooling functions, reducing the energy consumption of Air Conditioning. The embedded pipes activate the concrete core in the building mass for storage and discharge of thermal loads. By using favorable night electricity, thermal energy can be stored in the concrete structure overnight. This can be used to compensate the cooling/heating load for the following day via radiation.
Apart from TABS, OPTI Y ceiling installation (173m2 active panels installed) was utilized at certain area to strength the heating and cooling performance. The radiant heating and cooling ceiling covers the sensible peak cooling/heating load of the office area. The system is fast reacting and adapts to load fluctuations in the office area. This provides unique individual user comfort. The active ceiling panels are distributed by a 4-pipe system which allows cooling and heating in different areas at the same time according to the users need.
Due to supply temperatures close to room temperatures the systems is ideally suited for the use of ground energy or the use of a free cooling system at night time, which is especially beneficial and will consequently decrease the operation costs.
Bayer Qingdao ECB Lighthouse was qualified as LEED Gold certificated in 2013, and awarded as Best Practice of Global Green Building from GFHS.
Projektové informace
Projektové informace
Partneři
Owner / Developer
Bayer MaterialScience (Qingdao) Co. Ltd
Architect
Bayer Technology and Engineering (Shanghai) Co., Ltd.
Podobné projekty
Aktivace betonového jádra Vědecká knihovna České Budějovice
Rivergate
Berger Logistik
Alibaba headquarters
Uponor Shanghai office, China
Vestas headquarters
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
Bahnhofpark, Sargans
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Austro Tower
Poslovni centar Adris grupe
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.