The Kastelli community utilises smart building services, Oulu, Finland
The Kastelli community utilises smart building services
Projektová fakta
Uponor participace
The planning of Oulu's first project implemented with the lifecycle model had clear starting points: long-term, safe and multi-purpose premises with structural solutions created to last were needed for residents of different ages. Special attention has been paid to energy efficiency and indoor air quality.
Durability and cost efficiency in a key role
The lifecycle model ensures a good price/quality ratio: durability of materials and low maintenance costs for the building have been taken into account in all decisions. Lemminkäinen is liable for maintenance for a service period of 25 years and coordinates the cooperation between the building's users and service providers, such as cleaning and food service companies. The careful planning and construction of the site are a top priority not only for the customer but also for the constructor committing to long-term liability.
The total costs of the project are spread out over the long term. Therefore, the city's initial investments are lower than usual. Kastelli's lifecycle costs for 25 years have been calculated at about EUR 86 million, including the cost of construction (about EUR 46 million).
Underfloor heating as part of smart building services
The Kastelli community centre, which is the first Nordic school to be awarded the Gold-level LEED for Schools certificate and the Finnish Association of Civil Engineers' 2014 RIL award, is an energy-efficient building that utilises smart building services solutions: each classroom is equipped, for example, with temperature and carbon dioxide sensors, which help control heating and air conditioning. Lighting is controlled by occupancy sensors.
The building is heated by energy-saving underfloor heating. The solution is an excellent fit for sites where the youngest users spend a lot of time sitting or crawling on the floor. In underfloor heating, heat rises evenly from the whole floor area, which means that there is no air circulation or sensation of draft.
– Kastelli has a large floor area, which serves well as a heat reservoir. Thanks to even heat distribution, room temperature can be kept slightly lower without compromising comfort, states Jouni Riikola, who worked as regional HVAC manager at Lemminkäinen during the project and currently works at Are.
Challenging installation, good end result
Uponor has supplied the Kastelli community centre with underfloor heating on a turnkey basis. The contract included both planning and installation; the latter was performed by Uponor's partner Lakeuden LVI-asennus. Furthermore, Uponor delivered drainage pipes and wells as well as soil and waste pipes to the site.Uponor planned heat outputs and designed piping and flow rates for the given outputs. During planning, special attention was paid to pipe routes and the heat emissions of underfloor heating in order to prevent excess output. It took over three months to complete the installation, and the operation was tricky at times.
– The installation was exceptional insofar as the entire surface of pipes was fastened to fixing rails, which were then shot into the base slab. This meant more work compared to the traditional method, says Uponor's WehoPEX business sales manager Ville Mäkelä.
Moreover, manifolds were installed on the suspended ceiling instead of on the floor and wall, which was not particularly troublesome.
– Good work planning makes possible even the most unusual solution, states Riikola.
Comprehensive and affordable package
Uponor was selected as partner for the lifecycle project thanks to its excellent and comprehensive turnkey delivery.– We offered an exceptionally cost-efficient and comprehensive package for the site, including planning, installation and implementation. In the planning solution, underfloor heating was optimised in order to minimise heat loss, says Mäkelä.
– The site was one of the single largest underfloor heating projects ever undertaken in Finland. Construction according to the lifecycle model is still fairly new. In public projects, credibility is also required from system providers, states Mäkelä.
Jouni Riikola was also very satisfied with the project.
– The guys promised to complete the planning rapidly. The plan arrived on time and was excellent – as were the materials.
Projektové informace
Projektové informace
Partneři
HVAC planning: Plan-Air
Installation: Lakeuden Kotilämpö Oy
Podobné projekty
Aktivace betonového jádra Vědecká knihovna České Budějovice
Rivergate
Berger Logistik
Bayer Qingdao ECB Lighthouse
Alibaba headquarters
Uponor Shanghai office, China
Vestas headquarters
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
Bahnhofpark, Sargans
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Austro Tower
Poslovni centar Adris grupe
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.