Wind turbine manufacturer Vestas’ new headquarters in Skejby nearby Aarhus in Denmark is very ambitious in terms of energy. It was the first building in Scandinavia, which could be LEED certified in the best category Platinum. Only about 150 commercial buildings in the world have achieved the American Platinum certification, and according to the Danish definition this is a low energy class 1 building.
From the outside Vestas HQ's structure is like a single house with office environments with shimmering dark and mosaic facades gathered around an open and inviting atrium. The atrium room is a central place in the building; here you arrive, and from here you can go out to the various departments and functions.
Vestas is a dynamic organisation in a constant development, and this requires flexibility concerning numbers and sizes of the offices. Thus, the office sections are designed with walls which can be moved forward and backwards in steps of 3 meters – just as you need. This way you can easily establish varied office environments with 1 to 20 person offices – without any effect on the technical installations of the building. Around 550 employees are working at Vestas' new headquarters in Aarhus, and thanks to the energy-saving technology, it is among the most sustainable office buildings in the country.
Aiming for LEED
To obtain the LEED certification for the project it is essential to have perfect working conditions, also during the construction period. For instance, many workers have to be prequalified to work on the projects. In this process the quality management of the involved companies will be checked out and evaluated. This is only one of many checkpoints. In addition, the construction site has to be built up in a very structured way and have a top security. There is no access for people on the site who have not been through a safety course first. All workers, supervisors etc. know where all the safety equipment is located.
The building must also have a certain degree of sustainability. For instance, when the building in about 100 years has to be demolished, the materials must be of a quality that can be recycled to a certain extent. The Vestas HQ achieved this honour to be even considered for LEED Platinum with Denmark's largest combined geothermal energy system; with 36 km of pipes, the system will supply the building with the required heating and cooling capacity and this in turn will result to about 50 percent less energy than an average office building.
Benefiting from Uponor expertise
The project was originally provided with cooling pipes in ABS / PE plastic. Neither the engineers nor installers had the strict security requirements in mind when they planned the system with ABS pipe, which of course must be glued together.
When the U.S. supervisors saw what the installer was doing, the work stopped. The management team in Vestas now decided to move the project from ABS for MLC. The requirement was a system that could cover the construction needs for piping of cooling water from 16-110 mm. Uponor was chosen because of its "green image" and because Uponor was the only supplier that could deliver a system with such a large spread in dimensions.
Projektové informace
Projektové informace
Partneři
contractor
Phil & Søn
Denmark
architect
Arkitema
Frederiksgade 22 Århus C
Denmark
installer
BJ Stål
Lundvej 38 8800 Viborg
Denmark
Podobné projekty
Aktivace betonového jádra Vědecká knihovna České Budějovice
Rivergate
Berger Logistik
Bayer Qingdao ECB Lighthouse
Alibaba headquarters
Uponor Shanghai office, China
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
Bahnhofpark, Sargans
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Austro Tower
Poslovni centar Adris grupe
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.