Energy Efficiency Center, Würzburg, Germany
Energy Efficiency Center
Projektová fakta
Uponor participace
The Energy Efficiency Centre is being built on the converted Hubland site not far from the university campus and will provide a unique research and demonstration facility for Germany in a project costing EUR 10.5 million that is funded by the Bavarian Centre for Applied Energy Research (Bayerisches Zentrum für Angewandte Energieforschung e. V. - ZAE Bayern). Uponor is a partner in the pioneering building, which is being prepared for DGNB Silver Certification.
Designed by Thomas Rampp, the 3,580 m2 building represents a real game-changer thanks to its bright roof membrane. The translucent outer skin spans the multi-layered roof superstructure, providing weather protection. The revolutionary membrane coating is one of several unusual concepts and products being used for the first time.
The aim of the ZAE is that the building should not just present high-tech ideas, but also to conduct a long-term evaluation of solutions that have been combined and optimised under realistic conditions for maximum energy- and cost-efficiency and to investigate and optimise interactions.
The central building controller and an associated research server are continuously supplied with data from 1,500 measuring points for this purpose. In addition, the weather forecast data from the meteorological service in Offenbach and the utilisation levels of conference rooms are also integrated for predictive energy usage.
The scientists are not just focusing on the measurable data, but also the perceptions of the building's users. "The building's sophisticated technology must be intuitive and must enhance well-being", insists Dr. Hans-Peter Ebert, Head of the Department of Functional Materials and Energy Technology. Naturally, this principle also applies to the cooling and heating system used in the two-storey building. The building services engineering planners, Ebert-Ingenieure GmbH Co. KG, consciously chose very different and innovative low-temperature concepts.
The Energy Efficiency Centre uses a steam-based district heating supply. A pipe manifold heat exchanger is used to produce pumped hot water from the district heating network to cover the heating requirements of the central heating system. The building's primary energy requirement of 151 kWh/m2a is covered using static heating panels and heating registers for the air conditioning system and for producing hot water in periods when the solar energy system is idle. The innovative insulating materials and well-conceived heating concept mean that the building only needs half the primary energy defined for new buildings according to the German government's Energy Saving Ordinance (EnEV).
Uponor Klett underfloor heating is used in the foyer, information centre and conference room to ensure draught-free comfort. However, the EEC is more than just a grand research project. One of the main purposes of the project is to increase public awareness of energy-efficient building services engineering. Hence the building is also to be used for exhibitions. To keep the space as flexible as possible, the architects and building systems engineers chose underfloor heating.
The expert fitters from Bechert Haustechnik GmbH installed a 347 m2 radiant heating system with 24 heating circuits. Uponor PE-Xa RED Klett pipes, size 16 mm x 1.8 mm, were laid 10 cm apart in the conference room and 15 cm apart in the information centre and foyer area. With a flow temperature of 39.7 °C (return 32.6 °C) the underfloor heating system covers a heat load of 41 W/m2 in the public areas.
"This new building will be our calling card", emphasises Prof. Vladimir Dyakonov, President of ZAE Bayern, explaining his organisation's aim to offer employees and visitors the best possible conditions.
Projektové informace
Projektové informace
Podobné projekty
Aktivace betonového jádra Vědecká knihovna České Budějovice
Rivergate
Berger Logistik
Bayer Qingdao ECB Lighthouse
Alibaba headquarters
Uponor Shanghai office, China
Vestas headquarters
S Group’s logistics centre for utility items
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
Bahnhofpark, Sargans
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Austro Tower
Poslovni centar Adris grupe
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.