Drainage system for heat and power station, Gdynia, Poland

Drainage system for heat and power station

The heat and power plant in Gdynia struggled with choking drainage ducts and the resultant elevated level of ground water, which would lead to flooding of the underground levels of the facility. The construction of a classic drainage system using excavation methods was seriously challenged and even impossible in many places due to collisions with numerous underground systems as well as the protective zones of overhead power lines. As a result, a decision was taken to build a new drainage network in the trenchless technology with the use of jacking drainage VipLiner DN630mm modules from Uponor Infra.

Project facts

Gdynia, Poland
Industrial
Drainage, Tailor made constructions, Industrial pipes
Completion: 2016

Uponor Involvement

VipLiner jacking drainage module VL-PD DN630mm L=1 m with cross-axial slots (240 slots of 150x1.5mm) – 895 modules

VipLiner drainage modules feature solid polyethylene (PE) pipes with smooth inner and outer surfaces. Due to their strength characteristics, special technology and geometry of their outer layer grooving, the modules can be used for trenchless drainage systems which lower the level of ground waters. VipLiner 1-metre drain module have slots made using a water jet cutter. 240 slots of 150mm x 1.5mm in size are spaced in perpendicular along the axis. Their cross-section has a wedge shape, with the narrower opening at the inner surface. Such cross-sectional geometry creates a natural reverse filter, ensuring that the soil surrounding the drain pipe is not washed away.

This world-first method is innovative and patented!

Slotted drainage VipLiner module has been awarded the TYTAN 2016 Award in the ‘Product of the Year’ category during the XIV International Conference "Trenchless Engineering" in Krakow.

Drainage system for heat and power station

Elektrocieplownia Gdynia 2016 VipLiner 1

Project information

Project information

Country
Poland
Completion
2016
Project Type
New building
Building Type
Industrial

Partners

Partners

Designer:
Dr Eng. Marcin Blockus (Ingeo Sp.z o.o, Gdynia)
Investor:
EDF Polska S.A. Gdynia Heat and Power Station
Contractor:
Przedsiębiorstwo Budownictwa Ogólnego i Robót Inżynieryjnych "INŻYNIERIA" Sp. z o.o. Płońsk

Similar projects

Weholite yields savings and smoother implementation

Weholite yields savings and smoother implementation

New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.

Record-breaking intake cooling system in the Philippines

Record-breaking intake cooling system in the Philippines

New challenges are where the Project Services Department at Uponor Infra feels most comfortable and can demonstrate its
continuously developing expertise. The aim on this occasion was to provide a seawater intake cooling system – a pipeline, intake structure and chlorination line – for the 420MW extension of the Pagbilao Coal Fired Power Plant on Luzon Island in the Philippines.
Sustainable  solution for  a pulp & paper mill

Sustainable solution for a pulp & paper mill

Weholite’s ability to withstand external wear, such as friction against the seabed, was an important criterion when the outfall pipe of Stora Enso’s pulp and paper mill in Nymölla, southern Sweden, had to be replaced.

 

 

A raw water system for the new power unit

A raw water system for the new power unit

To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.
Stora Enso Nymölla mill biogas facility

Stora Enso Nymölla mill biogas facility

Stora Enso Nymölla Mill in southern Sweden produces pulp- and wood-free uncoated paper and is the second largest paper manufacturing company in Europe. Nymölla Mill belongs to the "Paper" division and has an annual capacity of 340,000 tonnes of pulp and 485,000 tonnes of paper. The mill started in 1962 and has 540 employees. The paper manufactured by Nymölla Mill is recyclable, renewable and biodegradable. Approximately 90% of Nymölla Bruk's paper brands have eco-label certification that certifies the products' reduced environmental impact during the product's life cycle. Paper products from Stora Enso are available all over the world.
 
Record-breaking pipes in Keljonlahti

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.
Extension of the district cooling station seawater intake in Helsingborg, Sweden

Extension of the district cooling station seawater intake in Helsingborg, Sweden

 The district cooling system in Helsingborg involves the streamlining of current production. By means of seawater and using heat from the district heating network to power an absorption cooling unit, district cooling provides much better environmental values than electric cooling units. The district cooling station is an efficient source of cooling for buildings, industrial facilities and shopping centres.

 

Fish farming with the smallest possible footprint

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.