References

Lightening structure of the General Road viaducts, Białystok, Poland

Lightening structure of the General Road viaducts

Increasing traffic problems in Białystok, in north-east Poland, led the local authorities to approve a project of the Generals’ Route designed to link the eastern and western part of the city. Use of polyethylene pipes in the construction of viaducts not only helped to lighten their structures but also lowered project cost.

Project facts

Białystok, Poland
Transportation
Tailor made constructions
Completion: 2012

Uponor Involvement

Weholite pipes SN2 DN700 mm – total 6257m (4133m in 2010 and 2124m in 2012)

The Generals’ Route project, estimated at almost 366 million euro, is the key investment for the city. The Generals’s Route together with the Copernican and Independence Routes form a bypass around the city centre, allowing the transport of residents. One of the principal objectives of the venture is to limit traffic density by redirecting transit traffic to the outskirts of the city. The Generals’ Route, running thought the streets of General F. Kleeberg, General S. Maczek, General W. Anders, General S. Sosabowski and General N. Sulik  allow to connect the national transit roads running from Warsaw to the border crossings in Budzisko and Bobrowniki. Local authorities hope the investment will not only limit existing inconveniencies to residents and drivers passing through Białystok but also stimulate the region’s economic growth.                   

First stage of the project carried out in 2010 was among others the General Maczek Str. extension that included the construction of new interchanges with overpasses and viaducts over the railway station. In order to lighten two objects’s structure PE Weholite pipes were used. Uponor Infra manufactured and delivered to the construction site over  4km of PE-HD Weholite pipes, with ring stiffness class of SN2 and size of DN700 mm. The length of the pipe sections was customized at the Uponor Infra plant to match exactly the dimensions of viaduct’s spans and reinforcement structure. The second stage carried out in 2012 was the extension of the General Andres Str., where to lighten the estacade 2km of Weholite SN2 DN700m pipes were used.

The decision to use plastic pipes to lighten the viaduct’s structure, wasn’t a pioneering one. Polyethylene pipe were used to build the Diameter Route in Grudziądz in 2007 for the first time.  Before that engineering designers had relied on steel pipes as their component of choice in similar projects. Steel pipes were not only significantly heavier than plastic pipes but also susceptible to damage from chemicals and adverse environmental factors. Weholite pipes provided the perfect answer to the challenges of the project:  lightweight, air-tight, extremely durable and easy to install, they put an end to problem of corrosion. Some savings were made in the use of concrete grout and reinforcing steel, which lowered overall project cost.

After prerequisite construction work on the viaduct was completed, the pipes were placed between reinforcement bars of the viaduct’s spans. The pipes were then secured with additional reinforcement, to prevent ejection by uplift force during the pumping of concrete. Pumping concrete grout into the spans constituted the final stage of the installation. According to the contractor overseeing the project, everything went smoothly and according to plan. 

 

Lightening structure of the General Road viaducts

Bialystok 2012 1

Project information

Project information

Country
Poland
Completion
2012
Project Type
New building
Building Type
Transportation

Partners

Partners

Contractor:
Mosty Łódź S.A i EUROVIA S.A
Investor:
City of Grudziądz

Similar projects

Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Retention tanks for the multimodal terminal

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.
Modernization of the lock on the barrage

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.