Population increases and industrial expansion have been challenging the local water company in Søborg, a busy urban environment on the edge of Copenhagen, Denmark, for years. Consumers have struggled with insufficient water supply and low water pressure. However, Uponor Infra has designed a complete pipe solution for a new water tank, which should begin operating in December 2016. End users can soon look forward to an improved water supply.

Project facts

Søborg, Copenhagen, Denmark
Transportation
Potable water
Completion: 2016

Uponor Involvement

400 m DN 800 / 300 m DN 630

Denmark’s largest water reservoir, which is about to be completed, can be found in Søborg, a busy urban environment on the edge of Copenhagen. The reservoir contains enough water – 300,000m3 – to  meet Copenhagen’s needs for around one day.

The first section of the original reservoir opened in the 1930s and it was expanded later in the 1970s. In the 1990s, the water company discovered several leaks in the foundation of the largest tank, tank 12, causing it to be closed down for renovation.

In 2015, a new solution was ready for implementation. In cooperation with the engineering company, Krüger, and the contractor, NCC, HOFOR decided to build a new tank inside the old, closed one. During this process, Uponor Project Service engineer Jan Lunding were consulted regarding pipes for the tank. Specially designed pipe solutions were required in order to meet the need for both emptying and filling the tank with water.

Lightweight pipes without corrosion

Uponor recommended PE100 pressure pipes, which are lightweight and designed not to corrode over time. HOFOR needed the pipes to be perforated in a very specific way to fit in with their fill simulation; in  response, Uponor designed a solution based on which the perforation worked as required.

Throughout the project, Uponor has provided technical support on issues such as pull strengths, calculations of flowability and recommendations for fitting solutions – all based on cost-effectiveness and competitive prices.

The pipes were put out to tender in February 2016. Uponor´s technical team designed a complete pipe solution and provided HOFOR with a 3D demonstration of how to make their vision a reality. Uponor was chosen to produce and deliver 400m DN800 pipes and 300m DN630 pipes.

Ready in December 2016

HOFOR found Uponor’s solution so compelling that Uponor was also asked to weld the pipes inside the container. On this occasion too, Uponor proved to be both service minded and cost competitive.

Uponors project managers and project engineeres have worked closely with the contractor throughout the project, to ensure that Uponor meets the deadlines in accordance with the project schedule.

The water tank is expected to begin operating in December 2016, when end users can look forward to a better water supply.

Tailor-made pipes ensure a better water supply

tinghoj vandreservoir 1

Project information

Project information

Country
Denmark
Completion
2016
Project Type
New building
Building Type
Transportation
Product lines
PE-Pipes for pressure pipe renovation

Partners

Customer: HOFOR
Engineering company: Krüger
Contractor: NCC
Pipe supplier: Uponor Infra Denmark

Similar projects

Faroe Island tunnel with Uponor pipe system

Faroe Island tunnel with Uponor pipe system

In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ice-free pavement throughout the year in Lahti

Ice-free pavement throughout the year in Lahti

The alterations to Aleksanterinkatu – the main street in the City of Lahti – will be completed by the end of 2016. The aim of the City's development projects is to make the centre more suitable for pedestrians and public transport. Uponor's role in the project is to build a snow melting system and the related frame lines for Aleksanterinkatu's pavements and zebra crossings. What is special about this project is that it marks the first time that Uponor's new Ecoflex Thermo Single 125/250 pipes have been used in Finland.
Retention systems for the S3 expressway

Retention systems for the S3 expressway

As part of the project “Construction of the second roadway of the S3 expressway along the Sulechów – Nowa Sól section – the second and third section” Uponor Infra provided pipes, sewer manholes and detention tanks.  
 
Storm water of the railway station

Storm water of the railway station

The specificity of constructing a storm water system as part of railway projects is that it must be resistant to, among other things, dynamic loads from the passing trains. In the case of the station in Konin, an important element of the storm water system is the retention tanks
Retention tanks in mountain areas

Retention tanks in mountain areas

Construction of the S1 expressway on the Przybędza-Milówka section, known as the bypass of Węgierska Górka. Uponor Infra polyethylene tanks were selected for drainage of the road system.
Retention tanks for the multimodal terminal

Retention tanks for the multimodal terminal

In Zduńska Wola - Karsznice, one of the largest multimodal terminals in Poland is being built. The most important elements of the stormwater management system of this terminal will be a battery of two Uponor Infra retention tanks.
Modernization of the lock on the barrage

Modernization of the lock on the barrage

At the Krapkowice barrage, the lock and control room are being modernized and the outports are being reconstructed. Uponor Infra delivered Weholite DN2000 SN8 polyethylene pipes as well as manholes, segmented bends and special fittings for this construction.