Church construction stages
In May 1999 works on the church substractures started. Roman Zero from Bielsko Podlaski was choosen for the construction manager, and the main foremen were Peter and Bogdan Zabloccy of Rudki near Branska. The church was built economically. In addition to permanent staff also members of parish community helped in works. Thanks to involvement and generosity of many people, site works progressed quickly. While the Ecumenical Devotion Drohiczyn, Holy Father Pope John Paul II blessed the foundation stone from the Basilica of the Holy Sepulchre of Jerusalem.
In 2000 Fr. Bishop Anthony Dydycz laid the foundation stone of the church.
From 3rd November 2001 St. Hubert has been honored in the parish, the patron Saint of hunters. His image blessed by Fr. The Bishop to be placed later in a special chapel in new church.
In 2002 site works in the church were proceeding quickly; there were floored in the church.
In the years 2005 -2007 bricklaying was finished, works on high spires started (together with the height of the towers they should achieve 38m). Also terraces were located there.
In the spring of 2008, works on electrification, radio and plastering of the church were made. Then underfloor heating Uponor Tacker system was installed on the area of 560m2. MLC pipe was used for the installation by Miazgasan - contractor from Siemiatycze – authorized installer that have been cooperating with Uponor since 12 years. Huge involvement in the project, technical support and Uponorian competences were appreciated by the parson.
In May 1999 works on the church substractures started. Roman Zero from Bielsko Podlaski was choosen for the construction manager, and the main foremen were Peter and Bogdan Zabloccy of Rudki near Branska. The church was built economically. In addition to permanent staff also members of parish community helped in works. Thanks to involvement and generosity of many people, site works progressed quickly. While the Ecumenical Devotion Drohiczyn, Holy Father Pope John Paul II blessed the foundation stone from the Basilica of the Holy Sepulchre of Jerusalem.
In 2000 Fr. Bishop Anthony Dydycz laid the foundation stone of the church.
From 3rd November 2001 St. Hubert has been honored in the parish, the patron Saint of hunters. His image blessed by Fr. The Bishop to be placed later in a special chapel in new church.
In 2002 site works in the church were proceeding quickly; there were floored in the church.
In the years 2005 -2007 bricklaying was finished, works on high spires started (together with the height of the towers they should achieve 38m). Also terraces were located there.
In the spring of 2008, works on electrification, radio and plastering of the church were made. Then underfloor heating Uponor Tacker system was installed on the area of 560m2. MLC pipe was used for the installation by Miazgasan - contractor from Siemiatycze – authorized installer that have been cooperating with Uponor since 12 years. Huge involvement in the project, technical support and Uponorian competences were appreciated by the parson.
Prosjektinformasjon
Prosjektinformasjon
Adresse
ul. 3 Maja 65
Land
Poland
Ferdigstilt
2008
Prosjektype
Ny bygning
Bygningstype
Kommunalt område
Lignende prosjekt
The Finnish Pavilion at the World Expo 2010 in Shanghai
Uponor provided a solution for a comfortable indoor climate for the Finnish pavilion at Shanghai World Expo.
KULMER's castle
A replica of Kulmer’s castle was constructed based on a project designed by a renowned Zagreb architect Branko Kincl.
Viimsi School and Kindergarden
New seconday school and kindergarden in Viimsi is for more than 350 pupils and 120 places for kindaergarden kids.
Tailored renovation solution
The Vierimaantie road, located close to the town centre of Ylivieska, Finland has a concrete sewer line constructed in the 1960s and 1970s. A decision was taken to renovate this sewer using a tailored solution, and the product developed for this purpose is now also available to other customers.
European Hospital of Marseille
The European Hospital is structured around poles of excellence that already made the reputation of Ambroise Paré and Paul Paré Desbief institutions. His care offer is completed by a modern and comprehensive technical platform.
Old saltwater pool in Reichenhall
The newly renovated building complex contains offices and the salt museum. And Uponor radiant heating systems ensure that it all stays at a comfortable temperature.
American School
“Move!” We are convinced, that sports, primarily mass sports and leisure time sports, have an emphasised role in Hungary today – both from a pedagogical and a medical point of view.
Utilization of geothermal energy in Mezőberény, using Uponor pre-insulated pipeline system
Energy-conscious solution With regards to natural gas market price changes and environment awareness Municipality of Mezőberény decided to submit tender under Environment and Energy Operational Programme in order to replace their natural gas based heating system in their public institutions with heat distribution system based on thermal water.
National Theatre
The building of the Hungarian National Theatre is one of the most famous and most modern buildings of the city. The theatre is on the banks of river Danube.
Cape Town Stadium, South Africa
Uponor helped set the stage for FIFA World Cup 2010 by equipping one of the semi-final stadiums, the Cape Town Stadium, with Uponor tap water system.
Gardens by the Bay, Singapore
Gardens by the Bay comprises two glass-domed conservatories and one waterfront garden in the heart of Singapore, around the Marina Channel. Uponor is proud to supply its radiant cooling solution to this premier tropical garden city.
Makkah Royal Clock Hotel Tower
Uponor cooling and MLC plumbing solutions are being used in one of the most exciting projects in the Islamic holy city of Mecca in the Kingdom in Saudi Arabia.
Cathedral Dome of Atri, Italy
In the course of several centuries, Atri has always been an important city both for civil and religious aspects. Uponor underfloor heating was installed.
Meander
Large, modern and fitted with the latest in air conditioning technologies. In 2012, construction work got underway on a new world class hospital on Maatweg in the Dutch city of Amersfoort. The building has since been handed over, and patients can now be better accommodated than at the old sites in Amersfoort.
Dutch National Military Museum
Located on the former Soesterberg military airbase, directly adjacent to the former landing strip, the Dutch National Military Museum is being built.
Elementary school in Poznan
This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011.
Hospital in Rzeszów
Provincial Hospital in Rzeszów. Medical rescue dept.
Airport in Rzeszów
The International Rzeszów-Jasionka Airport is situated in the Podkarpacie Province – one of the most beautiful regions of Poland.
EMT: Bus depot, Madrid
The Empresa Municipal de Transportes de Madrid, SA (EMT) installs Uponor´s Invisible Air- Conditioning system in the newly renovated bus parking facility.
Umwelt Arena
Opening in 2012, the Environmental Arena offers business and organisations from the environmental sector the largest and most spectacular platform for promoting environmental issues and energy efficiency.
IKEA
The IKEA homestore in Rothenburg in the Canton of Lucerne, uses the TABS Thermally Active Building System from Uponor to cater for heating and cooling requirements.
Inselspital
The intensive care, emergency medicine and surgery centre of the Inselspital hospital in Bern, known as the INO, is efficiently heated and cooled using Uponor Contec Single.
Muottas Muragl
Muottas Muragl is a popular mountain vantage point in St. Moritz. Work began on the refurbishment of the mountain resort hotel in 2010. Uponor supplied the radiant heating/cooling system for the project.
Groomes Country House
Groomes Country House Hotel has been given a modern make over with 150 m2 Uponor MLCP UFH.
Церква «Дім Архітектора»
Дім молитви церкви «Дім Архітектора»
St. Mary’s Cathedral
The 1,200-year-old St. Mary’s Cathedral in Hildesheim is currently undergoing a restoration.
Tom Mutters School
For the Tom Mutters School renovation, Uponor Minitec and Knauf Levelling Screed 425 were used to achieve a low profile, despite having to add levelling.
Santa Maria Assunta Cathedral - Teramo, Italy
The Teramo Cathedral is situated in the heart of the city, and it is centered among four historical neighbourhoods. Uponor underfloor heating was installed.
Abbey of Praglia
Selected for maximum flessibility and durability, Uponor's preinsulated pipes connect the wood chip boiler to the pump unit located within the abbey perimeter.