Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

Apartment building Varsta Oy, Turku, Finland

A line renovation was carried out in a block of flats in Turku using Uponor's R2I elements

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.

Коротко про проєкт

Turku, Finland
Багатоповерхові будівлі
Станції ГВП
Рік завершення будівництва: 2017

Expedited scheduled on the pilot site

The As Oy Varsta company, located in Turku, owns and manages five buildings constructed in 1968 and 1969. The four single-block buildings and one modular building contain a total of 162 flats. All in all, 162 bathrooms and 27 separate toilet rooms will be renovated on the site using prefabricated elements. The principal contractor is Rakennuspalvelu J. Martti & Co Oy. Design and supervision on the site will be conducted by RTC Vahanen Turku Oy.

The design phase began at the end of 2015. The decision was made to use Uponor's R2I cassette for scheduling reasons as well as the use of space.

"The client did not want to demolish the old flues, so R2I cassettes were the most sensible solution for this space. In addition, while preparations were being made for the design phase, the client was seeking scheduling benefits," says Uponor's Wahlfors.

When the contractor submitted its quote, it proposed a quicker-than-normal implementation schedule and the client selected the contractor on this basis. According to Jari Salonen, the foreman at contracting company Rakennuspalvelu J. Martti & Co Oy, the schedule was adjusted to suit the pilot site.

"The first building was deliberately given a more generous timetable. As the product was new to the team, it spent time seeking the correct implementation method during the first few installations. By rearranging the work phases, the team was able to find the right rhythm and means of completing the work," says Jari Salonen, the foreman.

Toni Wahlfors is grateful that all of the parties involved were committed to the project and developed their working methods together. Vahanen's Mikko Helander, who worked as project manager during the planning phase and as the HVAC designer, highlights the same matter.

"Prefabricated elements were a highly suitable solution for this site. Now that we have addressed the initial challenges together, the work is progressing quickly and the quality is high.  The practical experiences obtained on the first site will help us to design prefabricated element solutions and implementation methods on forthcoming renovation sites," Helander says.

The first building was completed at Christmas and the flats are already in use. Work is now underway in two buildings, which are being completed in tandem.
 

A personalised bathroom for everyone

For residents, Uponor's R2I cassette means faster completion and also stylish, personalised solutions. The residents of Varsta were able to choose the surface materials for their bathrooms. Surface tiling and furring, as well as the appearance of the push-button, can make a big difference to the appearance of a bathroom. Every resident will get a unique, personalised space. There is plenty of choice. We have also received good feedback for the wall-mounted toilet, which is adjusted to the desired height during the installation phase. The wall-mounted toilet creates a feeling of space in smaller rooms, while making cleaning easier.

Easy maintenance

In addition to easy installation, the benefits of R2I also include easy maintenance. The pipes can be serviced without breaking structures. The use of prefabricated elements also guarantees a leak-free result. Moisture damage cannot arise because any leaks will be detected in waterproofed spaces. The entire mechanism can be replaced without breaking the waterproofing when components are changed.

"I believe that prefabricated element products will be highly important in the future. Operating methods must be updated and new methods must also be created for line renovations. The nature of each site will be instrumental in determining how the benefits of a prefabricated element solution can be ensured," says Mikko Helander from Vahanen.

Uponor's R2I cassette and other R2I products are a cost-effective option for renovations. There is a need for new renovation methods, as well as widespread interest.

"A new site is currently ramping up, and Rakennuspalvelu J. Martti & Co Oy will be the principal contractor again. This year, approximately 200 flats in Turku will be renovated using Uponor's R2I cassette," confirms Uponor's Toni Wahlfors.

A line renovation was carried out in a block of flats in Turku using Uponor's R2I elements

varsta1

Інформація про проєкт

Інформація про проєкт

Країна
Finland
Рік завершення будівництва
2017
Тип проєкту
Реконструкція
Тип будівлі
Багатоповерхові будівлі

Партнери

Партнери
Contractor: Rakennuspalvelu J Martti  Co Oy
Planner: RTC Vahanen Oy
Fitter: Asennuspalvelu RST Oy

Подібні проєкти

A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.