Can Domenge, Palma de Mallorca, Spain

Energy efficiency, comfort and Mediterranean essence.

320 families live in the Can Domenge Residential Complex (Palma de Mallorca), developed by Grup Bauzá's real estate company Cotesa-Mallorca. A central and privileged area composed of 8 buildings whose names pay tribute to the city. Upunor joined the development's design team from the third building, Born (III) - following Bellver (I) and Almudaina (II), with its Combi Port and Aqua Port solutions, which form part of the housing units of the Rambla (IV), Marítim (V), La Seu (VI) and Tramuntana (VII) phases, in addition to the aforementioned Born.


Homes with 2 bedrooms or more in modern buildings that combine functionality and quality of materials with respect for the environment, and comfort and well-being thanks to Uponor underfloor heating systems and domestic hot water distribution.

Коротко про проєкт

Palma de Mallorca, Spain
Багатоповерхові будівлі
Загальна площа: 4.500 m2
Поверхневе опалення/охолодження, Система гнучких труб для водопостачання та радіаторного опалення
Рік завершення будівництва: 2022

Вклад Uponor

Aqua Port and Combi Port for Invisible Underfloor Heating

The opportunity to collaborate with Uponor was sought from the beginning of the project, but we were not able to start working together until phase 3, with the Born building, for which we pursued the main objective of optimising energy consumption and interior space in the homes," says Alex Gutierrez, Industrial Technician at Grup Bauzá specialising in Environment and Energy Efficiency. 

In order to design a centralised system, the heat generators - combined with solar energy - were placed on the roof. From there, the water is delivered to the households via a two-pipe distribution system to the Combi Port stations of each home, instantly producing DHW and Invisible Underfloor Heating.


 

Optimising energy consumption and space inside the home

The Uponor service team immediately carried out a study of phase 3, which we were designing at the time, and presented us with the possibility of installing the Combi Port. We then tested this solution in phase 2, which had not yet been delivered, and seeing the performance, investment and maintenance, our engineering team gave the go-ahead to include it in the project's installation programme," says Alex Gutierrez

The performance test carried out in phase 2 was among the reasons that convinced Bauzá's Technical Department to choose the Uponor solution Combi Port, where "it was possible to appreciate the quality of the equipment components at first glance, as well as the positive results obtained in the operating tests, where the temperature difference between the primary circuit and the DHW production temperature was barely 3 degrees". 



This collaboration continued to develop, optimising solutions based on accumulated experience, until the last of the recently completed developments (Tramuntana). In total, Uponor has been involved in 5 of the 7 buildings that make up Can Domenge, and the collaboration with Cotesa now extends to new projects that Grup Bauzá has underway.

 “The owners of the phases developed with Uponor are very satisfied, showing us that the decision was the right one. We have also managed to optimise the interior space of the home and increase the energy efficiency of the building" Alex Gutierrez, Industrial Technician of Grup Bauzá

Інформація про проєкт

Інформація про проєкт

Адреса
Carrer de l'Uruguai, 6, 07010 Palma de Mallorca, Illes Balears
Країна
Spain
Рік завершення будівництва
2022
Тип проєкту
Референс об'єкти
Тип будівлі
Багатоповерхові будівлі
Продуктові лінійки
uponor.productline.title.3c94e3a6-69b5-4b8f-997b-fb7089cc9864, uponor.productline.title.e17400a9-ede6-4606-93a2-81537686474a, uponor.productline.title.820994c2-f8be-4cea-a93e-4dcead87b97b

Партнери

 “The owners of the phases developed with Uponor are very satisfied, showing us that the decision was the right one. We have also managed to optimise the interior space of the home and increase the energy efficiency of the building" Alex Gutierrez, Industrial Technician of Grup Bauzá
Партнери
Project management: Engineers Assesors S.I.
Developer: Cotesa (Grup Bauzá)
Installer: Coemsa

Подібні проєкти

A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.