Line renovation is easy with the Uponor technical wall, Vantaa and Espoo, Finland

Line renovation is easy with the Uponor technical wall

The Uponor technical wall is a modular line renovation system particularly suitable for blocks of flats designed after the beginning of the 1970s. Technical walls are wall elements with all the required plumbing, underfloor heating rises, sewerage and ventilation services already installed in them. Suitable wall-toilet elements and electric routing elements have also been designed for the system. Industrially manufactured elements speed up line renovation and ensure that it is always of the highest quality.

Коротко про проєкт

Vantaa and Espoo, Finland
Багатоповерхові будівлі
Станції ГВП
Рік завершення будівництва: 2017

Вклад Uponor

-

The idea behind the Uponor technical wall was to combine the latest components with the latest planning models for building services. Over the years, Uponor has launched several innovations such as composite pipes and self-contained plumbing elements. At the same time, an ever-growing percentage of the sites to be renovated are type houses with standard dimensions. This enables the modelling of house structures. Therefore, the need for house-specific planning is lower and the planning process is faster. The Uponor technical wall and the related Flowall concept were born from an idea of construction consultant Juuso Hämäläinen. Thanks to the high level of industrial manufacturing and the type houses, line renovations can be carried out significantly more efficiently.

 

Highly refined concept

Newer houses have many common features that help make project management more flexible within the principles of lean manufacturing. When the structures are known, all schedules and procedures can be planned efficiently in one pass. More efficient product flows account for actual savings of 30–70% during the construction phase. In the Uponor technical wall system, costs are reduced, for example, by the fact that the HVAC components required for the flat can be installed in the wall elements already at the factory. Element coupling and surface material finishing are the only tasks that need to be carried out at the construction site.

Sweco Expert Services Ltd's Antti Ollikainen – the director of the housing companies' repair unit – says that there may be several technical pitfalls in the line renovation, such as the ventilation ducts made of rock material. Old flues often require thorough renewal, which cannot necessarily be done in the traditional way. Thanks to the Uponor technology wall, old flues made of rock material can be removed, which also increases the living area.

According to Ollikainen, the Uponor technical wall and the Flowall concept bring a new professional approach to line renovations as the customer can now be offered proven comprehensive solutions. Older houses may hold surprises. Furthermore, dimensions and structural solutions are not easily comparable. Modelled house types and the modular construction method enable to speed up on-site work by about 2 weeks. In other words, the overall duration of the project is 10–15% shorter compared to the traditional procedure. For instance, it only takes one day to install flat-specific climbing elements.

 

Pilot projects in Espoo and Vantaa

Sampo plc has chosen the Uponor technical wall as the solution for the walls of the damp areas in several blocks of rental flats under its ownership. The project is expected to run from March 2015 to February 2017. Of the three sites to be renovated, one is in Martinlaakso, Vantaa and the other two are in Matinkylä, Espoo. For example, As Oy Raivionsuonmäki Oy has 40 flats and a total volume of 10,500 cubic metres. There are three stair halls. The total number of flats at Sampo's pilot sites amounts to 150, which will increase to 161 after the renovation. The increase in the number of rental flats will also result in an increase in their total floor area. All of this is thanks to the fact that the Uponor technical wall requires less space.

According to Valvontakonsultit Oy's project manager Juuso Hämäläinen, price and quality factors were given priority during decision-making. It has been calculated that the Uponor technical wall will generate savings of about 10% compared to the traditional method.

Line renovation is easy with the Uponor technical wall

raiviosuo1

Інформація про проєкт

Інформація про проєкт

Країна
Finland
Рік завершення будівництва
2017
Тип проєкту
Реконструкція
Тип будівлі
Багатоповерхові будівлі

Подібні проєкти

A housing company in Turku saved time and money using Uponor's Cefo pipe overhaul

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.

A line renovation was carried out in a block of flats in Turku using Uponor's R2I elements

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

Linjasaneeraus helpoksi – talotekniikkakasetti on valmiiksi mietitty kokonaisuus

Helsinkiläiseen vuonna 1962 rakennettu asuinkerrostaloon tehtiin vuonna 2018 linjasaneeraus, vanhat putket korvattiin Uponor Reno Port -talotekniikkakasetilla, joka sisältää käyttövesiputket, pystyviemärin ja seinä-wc:n sekä vesi- ja viemäriliitännät viereen asennettavaa pesuallasta varten.
George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.