Quail Hollow, Charlotte, NC , USA

Condo replaces leaking steel with Uponor PEX piping system

The Quail Hollow residential community outside of Charlotte, N.C., offers convenience for its residents who live in close proximity to a PGA-ranked golf course, shopping and other lifestyle amenities. But the 30-year condominium complex, consisting of 12 separate buildings, was starting to show its age. The existing pre-insulated steel distribution piping system was far from sound or energy efficient. Ground water had penetrated the pipe’s insulation, providing higher-than-normal energy costs, while also corroding the connections, resulting in leaks. The system had been forced to shut down several times to allow for costly repairs. Tired of the problems and the added energy costs of the outdated system, the association decided to look for a solution.

Коротко про проєкт

Charlotte, NC , USA
Багатоповерхові будівлі
Рік завершення будівництва: 2012

Вклад Uponor

Project highlights

  • 12-building condominium complex with district energy
  • Mature landscape with existing trees, walkways and utilities
  • Ecoflex® replaces outdated pre-insulated steel piping
  • Installed by Piedmont Natural Gas

Products used

  • 600 feet of 3" Ecoflex Thermal Single
  • 2,400 feet of 2½" Ecoflex Thermal Single
  • 900 feet of 2½" Ecoflex Thermal Twin
  • 1,800 feet of 2" Ecoflex Thermal Single
  • 600 feet of 2" Ecoflex Thermal Twin
  • 900 feet of 1½" Ecoflex Thermal Twin
  • 26 Ecoflex Insulation Kits

Uponor Ecoflex® pre-insulated piping system was the superior choice for this condominium complex

The property surrounding Quail Hollow consists of mature trees, roads, parking lots and sidewalks, and it was important to work around the existing design. Ecoflex® from Uponor proved to be the perfect product for the job. With its long, flexible coils up to 600 feet in length, Ecoflex requires less trenching, fewer connections, less disruption to existing landscape and faster installation times than traditional rigid products.

Piedmont Natural Gas in Charlotte was awarded the contract for the underground piping installation and the project started in August 2011. Brad Stroud, project manager for Piedmont, was excited to learn about Ecoflex. “I had only worked with steel pipes in these types of installations,” he said. “But Uponor provided training and installation assistance to make the learning curve quick and easy.”
 

Flexible Ecoflex provides solution


Two central energy plants provide hot water for heating, chilled water for cooling and domestic hot water to each unit in the complex. Underground piping delivers hot and chilled water to forced-air fan coil units and domestic hot water to the plumbing system.

Due to the outstanding insulation properties, durability and flexibility of Ecoflex, it was a perfect fit for the job. Ecoflex features Uponor crosslinked polyethylene (PEX-a) service pipe protected by multi-layer, PEX-foam insulation and covered by a corrugated, watertight, high-density polyethylene (HDPE) jacket.

“Initially, I found the uncoiling of the product to be cumbersome,” Stroud said. “But the continuous length of coil along with the flexibility of the piping made up for any hesitation I had up front.”

In fact, Stroud’s initial concern of uncoiling product was solved later in the year with a new and improved design launched in late 2011. The new device provides quicker, more effective uncoiling of Ecoflex at worksites, making the installation process even more efficient.

By late fall, residents of Quail Hollow benefitted from a new, reliable system with far superior energy efficiencies. Now the residents can enjoy their homes without the concern of costly system repairs, unreliable water temperatures and inconvenient system shut-downs.

I had only worked with steel pipes in these types of installations. But Uponor provided training and installation assistance to make the learning curve quick and easy.

Quail Hollow

Uponor pre-insulated Ecoflex system installation image at Quail Hollow multi-family home in North Carolina

Інформація про проєкт

Інформація про проєкт

Країна
USA
Рік завершення будівництва
2012
Тип проєкту
Референс об'єкти
Тип будівлі
Багатоповерхові будівлі

Подібні проєкти

A housing company Petreliuksenrinne

A housing company Petreliuksenrinne

The Petreliuksenrinne housing company controls a group of residential buildings that were constructed in 1969. The company manages 124 flats, which were subject to an overhaul of their water supply and sewerage systems. The floor drains, bathrooms, electricity distribution and antenna systems were also overhauled.
Apartment building Varsta Oy

Apartment building Varsta Oy

Line renovations in blocks of flats can be conducted significantly faster and more easily. The Uponor R2I cassette makes for a problem-free renovation. Thanks to advanced prefabrication, the project period is shorter and the risks are lower. The As Oy Varsta company in Turku is the first R2I pilot site. The site will be completed to an expedited schedule.
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.
Ewha Campus Complex

Ewha Campus Complex

Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.

George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.
Sluseholmen

Sluseholmen

The Uponor project ’Sluseholmen’ has served as inspiration for developing a brand new and advantageous plumbing solution.
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
 
Brusaporto apartments

Brusaporto apartments

Two apartment buildings in Brusaporto, Italy, offer a high level of living comfort after renovation – also thanks to the Uponor Minitec underfloor heating system. With its low installation height, it is ideally suited for retrofitting.
Refurbishment of a prefabricated building

Refurbishment of a prefabricated building

During the renovation of a prefabricated building in Zwickau, Robinienweg, a low installation height stood in contrast to the desire for more energy efficiency and comfort through underfloor heating. The solution: a slimline combination of Minitec underfloor heating from Uponor and N 440 leveling screed from Knauf.
Applewood Pointe

Applewood Pointe

Developed by Uponor, this new solution takes the guesswork and freelancing out of piping installations. Each kit, which includes all the needed ProPEX® fittings, adapters, valves, and rings, is delivered to the job site — one kit per room or apartment — along with a material list and an isometric layout for the installer to follow, helping to minimize mistakes and maximize efficiency.
Infinity Forest Residence

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.