POSCO Green Building, a future-oriented building with environment-friendly and energy reduction technology applied, is located on the Yonsei University International Campus located in Songdo, Incheon on November 19th, 2013.

The project was completed in 1 year and 2 months and has been opened in November 2013. It consists of an office building (5 floors, B1~4F, total square of 5571sqm), joint housing building of 5 units (3 floors), 4 modular home units and a PR exhibition hall.

The building was carried out as part of the Ministry of Land, Infrastructure and Transport R&D project. The approach has been to spread green technology to new buildings and considered environment-friendly and low energy in the processes from design and construction to operation and disposal.

More than 100 green technologies including solar power, geothermal air-conditioning and radiant heating/cooling both in ceiling and underfloor, vacuum outsulation, and ICT (Information Communication Technology) are applied to the building, optimizing energy performance and saving energy usage from 30 to 100% compared to existing buildings. Further, it is an environment-friendly building where approximately 35% of the energy required by the building is self-generated utilizing new renewable energy.

Факти за проекта:

Incheon, New Songdo, Korea (Republic of)
Офис сграда
Лъчисто отопление и охлаждане
Завършване: 2013

Участие на Uponor

5571 sqm (gross floor area)
Uponor provided the building with radiant underfloor system on the first floor lobby to absorb the sun radiation and keep the area warm and cool. Besides, Uponor radiant ceiling Comfort Panels are installed in office area of 2rd and 3rd floor so that the visitors can experience Uponor's two systems at the same time experimentally on the 1st floor for underfloor system and on the 2nd and 3rd for radiant ceiling panel in this limited space.

Posco Greenbuilding undoubtedly will be the stepping stone project for Uponor's future business of radiant heating/cooling and it presented an opportunity for Uponor to demonstrate and promote a suitable energy solution as well as optimized inside-building comfort and ease on the South Korean market.

The project was specified and installed by a dependable local partner GSgreentech through the local representative Jooyoung Seo.

Posco Green building

Front view

Информация за проекта

Информация за проекта

Адрес
Yonsei International Campus
Държава
Korea (Republic of)
Website
http://www.poscogreenbuilding.co.kr
Завършване
2013
Тип на проекта
Нова сграда
Тип сграда
Офис сграда
Продуктови линии
Uponor Tacker, Uponor Comfort

Партньори

Партньори

Architect

Posco A&C

Contractor

Posco Engineering and Construction

Investor

Yousei University

Specifier

Gsgreentech Co, Ltd.

Подобни проекти

HAMK's zero-energy hall uses energy piles

HAMK's zero-energy hall uses energy piles

Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

Auron

Auron

The Uponor Contec ON concrete surface activation heats and cools the AURON office building complex in Munich.
Brain Box Berlin

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.

 

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Standard Bank

Standard Bank

Uponor PE-Xa pipe used for refurbishment of chilled water pipelines in the head office of South Africa's Standard Bank located in Johannesburg.
Immeuble Delta Green

Immeuble Delta Green

La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.

Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Rivergate

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.
Berger Logistik

Berger Logistik

Berger Logistik transports goods by land, sea and air around the globe. The company was founded in 1961 by Johann Berger and is based in Wörgl, in the Tyrol region of Austria.