ΠΡΠ΅ΠΏΡΠ°ΡΠΊΠΈConcrete core activation ΔSOB Prague,
Concrete core activation ΔSOB Prague,
Prague,
Czech Republic
Concrete core activation ΔSOB Prague
Heating and cooling using in the office building.
Location
Prague, Czech Republic
ΠΠ°Π²ΡΡΡΠ²Π°Π½Π΅
2019
Π’ΠΈΠΏ ΡΠ³ΡΠ°Π΄Π°
ΠΡΠΈΡ ΡΠ³ΡΠ°Π΄Π°
Product systems
ΠΡΡΠΈΡΡΠΎ ΠΎΡΠΎΠΏΠ»Π΅Π½ΠΈΠ΅ ΠΈ ΠΎΡ
Π»Π°ΠΆΠ΄Π°Π½Π΅
Π’ΠΈΠΏ Π½Π° ΠΏΡΠΎΠ΅ΠΊΡΠ°
ΠΠΎΠ²Π° ΡΠ³ΡΠ°Π΄Π°
The entire complex was planned using BIM technology
The new ΔSOB bank headquarters for uses concrete core activation for heating and cooling. The entire building is equipped with a combination of the Contec and Contec ON systems. The Contec ON system is installed adjacent to the faΓ§ade, while the Contec system is installed in the core of the building. The new headquarters building meets even the highest ecological standards in accordance with LEED Platinum international certification. The heating source are heat pumps with a total of 173 150 m-deep boreholes. The building complex comprises several “freestanding” buildings connected by a central atrium. The entire complex was planned and continues to be operated using BIM technology.