The foundation stone of the new logistic centre for the S Group, to be built in Sipoo, was laid in March 2010, and the centre is scheduled for completion during 2012. Ten times larger than the Finnish Parliament building and corresponding to approximately 2,350 detached family houses, the total floor space of the building will be 75,000 gross square metres and its gross capacity will total over one million cubic metres.
Project facts
Large scale poses challenges
The main contractor of the earth construction work, Maarakennusliike Lehtonen Oy, began its work in November 2009 and handed over the task of main contractor to Lemminkäinen from the beginning of May 2010.
“We’re responsible for the excavation, indoor and outdoor pipes, drainage and storm water gullies. The contract period is one year, so our share of the work will be completed in mid-December this year,” Construction Manager Esa Hakkarainen of Maarakennusliike Lehtonen explains.
“In terms of scale, this is an extremely large individual project. The laid concrete alone will amount to approximately 6,000 m3. We’ll install a total of 13 kilometres of indoor and outdoor drains and a similar length of electricity protection pipes. The number of wells, including cable manholes, totals 260.
“It’s important for the client that the strorm water gullies and pipes come from the same place to ensure the absolute reliability of joints. All products to be used were approved by the client in advance, and the approval was subject to the products having been documented and the necessary product data being available for them.
” Uponor has delivered in excess of two kilometres of 893/800 mm storm water pipe and approximately 200 wells to the site of the logistics centre. Sewerage will be implemented with the 200 mm Uponor Dupplex sewer system and the water pipes with the 315 mm Uponor Profuse pressure pipe system.
“Uponor’s references carried a lot of weight in the selection. All aspects in this project have functioned extremely well. I’m pleased that we can discuss things with just one supplier in this product area and that the same parts can be used in several locations. Our collaboration with Uponor goes back decades and we also have previous experience in major joint ventures, such as the Helsinki-Vantaa Airport.
“The project has progressed according to schedule, despite the harsh winter weather conditions this year. The cold weather did not hamper the progress too much, because all the pipes needed grooves to be excavated into the rock. The landfill material was well-compacted and the entire southern side was completed during the winter.” “In a project of this scale, it’s crucially important that deliveries are carried out on time. In this respect, we’ve had no problems with Uponor whatsoever,” Supervisor Markku Tepsa of Maarakennus Lehtonen confirms.
At its busiest, the earth construction project has employed more than 80 men, including subcontractors.
The total investment for the Sipoo logistics centre is approximately EUR 150 million. After completion, the centre will provide employment for about 700 people. The employment effect during construction is several thousand person-years.
Project information
Project information
Partners
contractor
Maarakennusliike Lehtonen Oy
Similar projects
Berger Logistik
Bayer Qingdao ECB Lighthouse
Alibaba headquarters
Uponor Shanghai office, China
Concrete core activation ČSOB Prague
Concrete core activation České Budějovice Research Library
Vestas headquarters
The installation of Uponor storm water cassettes in Shopping Center Karisma, Lahti
The extension of Veljekset Keskinen is heated with Uponor's underfloor heating system
Kiviniityn Auto- ja Maatalouskonehuolto acquired a new underfloor heating and cooling solution
HAMK's zero-energy hall uses energy piles
Technopolis Innova 2 in Jyväskylä, Finland is heated by energy piles
The Kastelli community utilises smart building services
Uponor's head office is a model example of energy efficiency
Day-care centre to be built with energy piles
Immeuble Delta Green
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
Institut les Mines Telecoms Saclay
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
Klimahaus Bremerhaven 8°
Auron
Berliner Bogen
Energy Efficiency Center
Ericusspitze Spiegelhaus
Kranhaeuser
Brain Box Berlin
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
Leitradlofts, Cologne
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
Villeroy & Boch
First Uponor Comfort Panel project in Hungary
Standard Bank
First radiant ceiling cooling renovation project in tropical climate
First radiant ceiling cooling renovation project in tropical climate – Singapore
Palazzo Ferrazzi - Brescia
Posco Green building
LH Headquarter in Jinju
Passive building with high energy efficiency
National Library of Latvia
Swedbank Head Office
Tap water system in new Swedbank head office.
Lithuanian National Art Gallery
"Sostena" Business Centre
Nathan, Zevenaar
Agder fengsel in Norway
Uponor in Sluppenveien 17
The New Deichmanske Library - Bjørvika, Oslo
Concrete Core Heating and Cooling Systems, Piešťany
Car dealership in El Escorial, Madrid
Ecobox Building
Zero emissions, maximum comfort
Uponor Iberia headquarters and logistics hub - Móstoles, Madrid
BESEL Head offices in Madrid
Länsförsäkringar Office building complex
Bahnhofpark, Sargans
BAE Systems Rochester
Sunesis school scheme: Sacred Heart Primary School, West Midlands
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Business center
Reconstruction of the office building of the Pharmaceutical Company "Darnitsa"
Demo smart house «IC Smart HOUSE live»
Shopping and office center
Austro Tower
Poslovni centar Adris grupe
Magnum Business center
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.