Stropy chłodzące/grzewcze TABS w Media Centrum
Dostarczenie niewidocznego systemu, który zapewni komfort cieplny w budynku z przeszkloną fasadą.
On the other hand, Uponor PEX-a pipe underfloor heating and invisible supply air duct are also installed in the whole office. DOAS (dedicated outdoor air system) in parallel with radiant cooling has been also applied. Cooling load of the conditioned space has been split into sensible load (36kW) and latent load (12kW). 100% of the internal latent load and 30% of the internal sensible load are covered by the DOAS. The remaining sensible load is covered by the Uponor radiant cooling system and controlled by Uponor Smatrix Wave Plus individual room controller. It constantly monitors changes in conditions inside and outside the building. By intelligently adjusting and adapting, Uponor Smatrix ensures that just the right amount of energy is used at just the right time.
This is already the third project we using DOAS in parallel with Uponor Radiant heating and cooling system in Asia region. With a combination with DOAS used in the case, it consists of two VSD fans for exhaust, fresh air and a mixing chamber. It allows maintaining healthy CO₂ levels at the same time to provide fresh air to the office space.
Dostarczenie niewidocznego systemu, który zapewni komfort cieplny w budynku z przeszkloną fasadą.
Varicool heating and cooling panels were installed to the meeting room's ceiling. The new hydronic system replaced the old fan coil unit system. Varicool system is a radiant heating and cooling system. The panels do not heat or cool the indoor air directly but the surfaces what radiant covers.
Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control in the new landmark Adlershof Science and Technology Centre.
A hygienically optimal drinking water installation was integrated into the new office complex – thanks to Uni Pipe PLUS within a very short time.
La dalle active Uponor est intégrée depuis 2017 dans l’immeuble Delta Green, bâtiment tertiaire de 4600m2 comprenant 4 niveaux. Celui-ci est le premier bâtiment de la région tout à fait autonome en énergie.
First radiant ceiling cooling renovation project in tropical climate – Singapore
Tap water system in new Swedbank head office.
Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.
Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.
MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.
MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.