Menu
Зв'яжіться з представництвом Uponor в Україні
Досвід застосування

Auron, München, Germany

Auron

Коротко про проєкт

München, Germany
Офісні будівлі
Поверхневе опалення/охолодження
Рік завершення будівництва: 2010

Вклад Uponor

39000
The first construction phase of the AURON office building was awarded a Green Building Gold certificate according to the provisions of the Deutsche Gesellschaft für Nachhaltiges Bauen (DGNB) [German society for sustainable building].


The Uponor Contec ON concrete surface activation heats and cools approximately 39,000 m² of floor space highly efficiently using regenerative energies. As a consequence, the system complies with the requirements relating to sustainability and high heating and cooling performance levels. The system also helps to improve the interior design as no radiators are required in the rooms. This means that there were no restrictions regarding the internal architecture, allowing Feng-Shui principles to be applied. The principals, Employrion Immobilien GmbH & Co. KG, a project company belonging to Accumulata Immobilien Development GmbH, and LBBW Immobilien GmbH, were especially impressed with the fact that Uponor Contec ON can be installed in a monovalent manner.


The Contec ON system is supplied with heat using a groundwater heat pump as well as from a district heating station. For heating, a flow of 32 °C and a return of 28 °C were selected. Using these parameters, the thermo-active ceiling achieves a heating performance of 60 W/m², and 53 W/m² in what is known as the drill-proof area.


Cooling units utilize the water from the well to cool the building. The system achieves a cooling performance of 70 W/m², and 63 W/m² in the drill-proof area. Contec ON is installed close to the surface, so compared to conventional concrete core activation this system offers a faster response. This means that the temperature of each of the units sized between 200 m² and 400 m² can be individually controlled. On the top floor of the seven-story building, Contec ON modules were installed in two different material qualities: on well-proven plastic mats and on special metal mats.


The required grid spacing of the elements was prefabricated in the factory. This ensures the necessary heating and cooling capacity and facilitates swift construction as the precise position of the heating and cooling pipes with respect to height is already guaranteed during the assembly phase. For the Contec ON modules equipped with metal mats, a pipe clearance of only 10 cm was selected. The Contec ON mats were placed directly on the control panels, and the system of pipes was routed axially with a clearance. Thanks to this design, partition walls can be optionally installed in the intermediate spaces.


In the area close to the building facade, Contec ON was routed at a distance of approximately 20 mm from the lower edge of the ceiling with a pipe clearance of 85 mm. This allows for fast supply and removal of heating and cooling loads, resulting in quick and efficient temperature control. The system delivers about 50 percent of the planned heating and cooling output in 30 minutes. For the areas inside the offices and on the corridor side of the floors of the building, the system was installed with a drilling safety clearance of 60 mm from the lower edge of the ceiling.


The routing clearance is 100 mm. In these drill-proof areas, 50 percent of the heating and cooling output is reached after approximately 60 minutes. In rooms with special requirements, such as corner offices, cooling elements supplement the Contec ON system. The elements are connected via additional thermal socket outlets from Uponor.
 

Auron

0002980

Інформація про проєкт

Інформація про проєкт

Адреса
Landsberger Straße
Країна
Germany
Рік завершення будівництва
2010
Тип проєкту
Референс об'єкти
Тип будівлі
Офісні будівлі
Продуктові лінійки
Contec ON Q&E

Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.