Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

Butz Aufzüge GmbH, Bergkirchen, Germany

The right system for every building

Butz Aufzüge GmbH has expanded its operations in Bergkirchen to include several new buildings. The specialist for high-quality lift systems also had high standards for its own construction project: heating and cooling is provided by various surface temperature control systems from Uponor.

Коротко про проєкт

Bergkirchen, Germany
Офісні будівлі
Поверхневе опалення/охолодження
Рік завершення будівництва: 2021

Вклад Uponor

Uponor Magna system on a total of 1,000 square metres | Uponor Thermatop M ceiling system on a total of 400 square metres | Uponor Klett underfloor heating on a total of 400 square metres

Top supply technology meets top lift technology

Picturesque landscape and a strong economy: the municipality of Bergkirchen in Upper Bavaria has both to offer. The pretty parish church of St Johann Baptist towers above the village and looks out over the Dachauer Moos. The Amper and Maisach rivers are perfect for hiking and relaxing in nature. With its five industrial estates and proximity to Munich, the municipality is an attractive business location. Butz Aufzüge GmbH has its headquarters here. Founded in 2010, the family business specialises in the planning and implementation of sophisticated lift systems, from passenger lifts and car lifts to bed and goods lifts. The company has grown considerably in recent years and needed more space. A number of new buildings have now been added to the existing buildings: a production and storage hall, an administration building, a single-storey intermediate building, an open garage and a private residence for the entrepreneurial family.

The buildings are heated and cooled with various surface temperature control systems from Uponor.

Butz-Bergkirchen

Uponor_Butz-Bergkirchen_01

Інформація про проєкт

Інформація про проєкт

Адреса
Bergkirchen, Deutschland
Країна
Germany
Сайт
https://butz-aufzuege.de/
Рік завершення будівництва
2021
Тип проєкту
Референс об'єкти
Тип будівлі
Офісні будівлі
Продуктові лінійки
Magna, Klett, Thermatop

Партнери

Партнери
Builder:
BUTZ AUFZÜGE GmbH
Bergkirchen
Website: www.butz-aufzuege.de

hoch3 Gewerbebau
Oberschleißheim
Website: www.gewerbebau-hoch3.de

Designer and planning office:
energieplan GmbH
Anzing
Website: https://energieplan-gmbh.de

Installation company:
Haberthaler GmbH
Anzing
Website: www.haberthaler.de

Interior architect:
Marion Rappl Dipl.-Ing. (FH)

Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.