Brain Box Berlin, Berlin, Germany

Brain Box Berlin

Thermal concrete core activation with Uponor Contec provides economical, energy-efficient and sustainable building temperature control on 8 floors with around 24,000 square metres of flexibly usable spaces for offices, production facilities and start-ups. 

Коротко про проєкт

Berlin, Germany
Офісні будівлі
Поверхневе опалення/охолодження, Металопластикові системи (труби та комлектуючі)
Рік завершення будівництва: 2020

Вклад Uponor

20,000 square metres thermal concrete core activation on steel matting provided by the client | 90,000 m Uponor Magna Pipe PLUS PE-Xa piping

Renovating and expanding with technology from Uponor

Berlin's Adlershof district is home to six science faculties of the Humboldt University in Berlin, numerous federal research institutions and the technology centres operated by state body WISTA Management GmbH (“Stadt für Wissenschaft, Wirtschaft und Medien - City of Science, Business and Media”). This makes Adlershof Germany's leading science hub and one of the 15 largest science parks in the world.

Heating and cooling surfaces from Uponor enable flexible room design

The new BRAIN BOX BERLIN is an innovative campus with spaces conceived with flexibility in mind, open courtyards, underground parking, charging stations for electric vehicles and lockable bike storage. The eight-storey tower to the east of the site establishes the facility as a landmark site. The eighth floor can be used as a sky bar and lounge area. The curving office complex consists of three components with four or five floors and enables different concepts for workplace configuration: cellular offices, co-working areas or open spaces. The smallest unit measures just under 200 square metres, while a complete floor offers about 3,000 square metres of space.

Thermal concrete core activation from Uponor

Modern building temperature control is a highlight of high-quality, ultra-modern building equipment. thermal concrete core activation on an area measuring approx. 20,000 square metres with around 90,000 m of integrated Uponor Magna Pipe PLUS PE-Xa pipes transform the ceilings of the rooms into heating and cooling surfaces that operate efficiently and sustainably, providing pleasant temperatures in the rooms throughout the year – providing a comfortable climate in which to develop new ideas!

Brain Box Berlin

Referenz Uponor BrainBox Berlin

Інформація про проєкт

Інформація про проєкт

Адреса
10179 Berlin
Країна
Germany
Сайт
https://brain-box-berlin.com/en/
Рік завершення будівництва
2020
Тип проєкту
Референс об'єкти
Тип будівлі
Офісні будівлі
Продуктові лінійки
Magna, Contec

Партнери

Партнери

Builder-owner:
Projektgesellschaft Gartenstadt Berlin-Adlershof GmbH

Architect:
Thomas Müller Ivan Reimann Architects 
https://mueller-reimann.de

Design:
Ed. Züblin AG Direktion Nord
https://zueblin.de

Construction:
PK Montage GmbH
www.primaklima-chemnitz.de

 
 

Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.