Head office of SachsenEnergie AG, Dresden, Germany

A new head office for SachsenEnergie AG

The new building for the largest energy supplier in eastern Germany was also a project of superlatives for Uponor: more than 14,500 Uponor Thermatop M modules for ceiling heating and cooling and more than 26,000 m of Uni Pipe PLUS pipes were installed on 13 floors.

Коротко про проєкт

Dresden, Germany
Офісні будівлі
Поверхневе опалення/охолодження, Системи металопластикових труб
Рік завершення будівництва: 2022
Кількість поверхів: 13

Вклад Uponor

14,500 Uponor Thermatop M modules | More than 26,000 meters of Uponor Uni Pipe PLUS

Modern mega-new building completed on time: SachsenEnergie moves into new company headquarters": these and similar headlines accompanied the completion of the latest high-rise building in Dresden in mid-2022. SachsenEnergie AG was created in 2021 through the merger of DREWAG Stadtwerke Dresden GmbH and ENSO Energie Sachsen Ost AG. Its new company building is the symbol of this merger and marks the strength of the new group of companies, which is now the largest energy supplier in eastern Germany. SachsenEnergie has invested a total of around 74 million euros in the new building. 

One headquarter for all employees 

The office complex - designed by architects von Gerkan, Marg and Partners - was built as a perimeter block structure and has two towers, the southern one of which is 51 meters high and has a total of 13 floors. The reinforced concrete structure was fitted with a metal and glass façade. The employees now have more than 900 modern workplaces on almost 18,000 square meters at their disposal. Over the next few years, the energy supplier's existing building, the CITY CENTER, will also be completely renovated. In 2024, the two buildings are to be connected so that all employees will be united in the same complex in future.  

Aiming for gold status in terms of sustainability 


From the SachsenEnergie Center, employees work every day to ensure a future-proof infrastructure and a sustainably secure supply for the entire region. It is therefore only natural that the new building should also meet very high standards of energy efficiency and sustainability: the SachsenEnergie Center has applied for gold certification from the German Sustainable Building Council (DGNB). 

The client SachsenEnergie will of course provide district heating and cooling itself.    

Heating and cooling in one 


The distribution of heating and cooling energy is also modern and efficient - with Uponor Thermatop M ceiling heating and cooling. The ceiling system can both heat and cool and is so efficient that additional wall heating is only required in individual rooms. It is also easy to install because the heating and drywall construction areas are clearly separated.A sample room was built on site to clarify all the details of the interface with the drywall construction, for example, and only then was the system installed on all floors. 

Five module variants 


Uponor Thermatop M makes it easy to create architecturally sophisticated, seamless and directionless heating and cooling ceilings. The system comprises five standard module lengths from 95 to 255 cm, which can be combined with each other to make optimum use of the space available according to the ceiling surface "As a rule, around 70 percent of the ceiling is covered with our modules, leaving enough space for recesses, such as for lamps or sprinklers," explains Hannes Klaves from Uponor's Technical Sales department, who oversaw the entire project. 

A total of 14,500 Thermatop M modules were installed over an area of 18,000 square meters. In addition, 26,000 m of Uni Pipe PLUS multilayer composite pipes with a diameter of 16 to 25 mm were used to connect the modules to the manifolds. As with many projects, Uponor also worked closely with Knauf on this high-rise building: It supplied the plasterboard panels, which the drywall contractor used to construct the suspended ceiling.  

Rapid construction progress


The entire project progressed very quickly despite the pandemic. The foundation stone was laid in May 2020, the topping-out ceremony in July 2021 and the opening just one year later.Installation planning for the ceiling heating and cooling began in March 2021, and all modules were installed by December 2021. Uponor Thermatop M now ensures comfortable temperatures in the SachsenEnergie Center.

 

Hauptverwaltung SachsenEnergie Dresden

Hauptverwaltung SachsenEnergie AG Dresden 1

Інформація про проєкт

Інформація про проєкт

Країна
Germany
Рік завершення будівництва
2022
Тип будівлі
Офісні будівлі
Продуктові лінійки
Thermatop

Партнери

Партнери
SachsenEnergie AG
www.sachsenenergie.de

Architect:
gmp International GmbH, Berlin
www.gmp.de/de

Planer:
Ingenieurbüro Rathenow BPS GmbH, Dresden
www.ibr-bps.de

Plumber:
Dresdner Zentralheizungsbau GmbH, Dresden,
www.dzh.de

Installed Uponor products

Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.