Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

Bayer Qingdao ECB Lighthouse, Qingdao, China

Bayer Qingdao ECB Lighthouse

Uponor’s Partnership with ECB

ECB Lighthouse, which serves as the administration building of a Bayer MaterialScience plant in Qingdao, is the first building in China of the Bayer Eco Commercial Building (ECB) Program. The ECB Program is a global initiative to provide an all-in-one solution through collective work from Bayer and its network of building partners to meet demand in China and across the globe for creating highly efficient and cost effective commercial and public buildings. 


Коротко про проєкт

Qingdao, China
Офісні будівлі
Поверхневе опалення/охолодження
Рік завершення будівництва: 2011

Вклад Uponor

1,000 ㎡

Bayer office is located in the Economic and Development processing Zone, and it is the city’s first zero-emission building. The 1,000 square meter complex holds 60 office workplaces and represents a building system where energy needs are covered through long-term efficiency gains and renewable energy generation.

The ECB lighthouse is a project where the fundamental functions, such as heating & cooling, lighting, hot water and ventilation, are all equipped with state-of-the-art technology to optimize energy usage, which recycles the building’s natural resources and utilizes solar energy for minimizing carbon emissions.

Aim of the ECB Lighthouse project is to provide building users with a high quality indoor climate with the lowest possible environmental impact and simultaneously reducing operation cost. Sustainable radiant cooling & heating systems are representing successful and interesting solutions to obtain and re-establish high comfort levels in offices. Their cooling & heating capacity is able to absorb/ cover all sensible loads inside the building and provide highly individual comfort. Therefore the air system can be reduced to provide fresh air at a minimum hygienic air exchange rate. This air system is also dehumidifying the space to cover the latent loads. So we can say goodbye to air systems with high flow rates and velocities which are the reason for local thermal discomfort. 

Uponor Radiant Heating & Cooling Systems

Uponor Thermally-active Building System (TABS) Contec, In-situ concrete and OPTI Y were applied to the building. Our project team participated from the building design, installation, supervision to the commissioning progress. Project was completed in September 2012, and in operation till now.

Uponor TABS system (583m2 Contec modules installed) was applied to the building which prefabricated piping embedded into center of the concrete slabs performing heating and cooling functions, reducing the energy consumption of Air Conditioning. The embedded pipes activate the concrete core in the building mass for storage and discharge of thermal loads. By using favorable night electricity, thermal energy can be stored in the concrete structure overnight. This can be used to compensate the cooling/heating load for the following day via radiation.

Apart from TABS, OPTI Y ceiling installation (173m2 active panels installed) was utilized at certain area to strength the heating and cooling performance. The radiant heating and cooling ceiling covers the sensible peak cooling/heating load of the office area. The system is fast reacting and adapts to load fluctuations in the office area. This provides unique individual user comfort. The active ceiling panels are distributed by a 4-pipe system which allows cooling and heating in different areas at the same time according to the users need. 

Due to supply temperatures close to room temperatures the systems is ideally suited for the use of ground energy or the use of a free cooling system at night time, which is especially beneficial and will consequently decrease the operation costs.

Bayer Qingdao ECB Lighthouse was qualified as LEED Gold certificated in 2013, and awarded as Best Practice of Global Green Building from GFHS.


Bayer Qingdao ECB Lighthouse

001 Lobby

Інформація про проєкт

Інформація про проєкт

Адреса
黄岛
Країна
China
Рік завершення будівництва
2011
Тип проєкту
Референс об'єкти
Тип будівлі
Офісні будівлі
Продуктові лінійки
Contec

Партнери

Партнери

Owner / Developer

Bayer MaterialScience (Qingdao) Co. Ltd

Architect

Bayer Technology and Engineering (Shanghai) Co., Ltd. 



Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
First Uponor Comfort Panel project in Hungary

First Uponor Comfort Panel project in Hungary

An office building, where proper comfort is provided for doing your job The commercial buildings provide more or less limited space as the workplace for people. Therefore cooling the air is an important factor in maintaining their comfort during their stay. In order to keep the daily work undisturbed, the system used should be installed easily, should be efficient economically, and should be hygienic.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.