Представництво Uponor в Україні
просп. Миру, б.15, оф.405
м. Київ, Україна
Досвід застосування

First Uponor Comfort Panel project in Hungary, Lajosmizse-Alsólajos, Hungary

First Uponor Comfort Panel project in Hungary

Коротко про проєкт

Lajosmizse-Alsólajos, Hungary
Офісні будівлі
Поверхневе опалення/охолодження
Рік завершення будівництва: 2012

Вклад Uponor

350
For this benefit, the investment of the Hungary Aliment Baromfikeresdelmi Kft., has been realized in Lajosmizse-Alsólajos. The goal of the project is the construction of a commercial building of more, than 300 square meters, which provides proper working conditions and comfort for the people. In the commercial building, a larger office for the executive workers, a conference room, lavatories, a financial office and the director's office have been built. The owner demanded a cooling system, which provides the necessary comfort without noise and draught.

A system for the liveable environment

Traditional air conditioning, air processing systems are less hygienic, less efficient economically, their installation is more difficult, and they are less flexible. These systems are based on air flow, which is distributed unevenly, causing a draught in the space, and providing relatively low humidity and temperature. These airflows dry eyes and upper airways. Due to low air heat capacity HVAC system installation requires large ventilation ducts that needs significant space within the building. These ducts get rapidly contaminated and may easily cause health problems. Unlike traditional HVAC systems Uponor Comfort Panel is a very efficient cooling system installed in the ceiling, often used in commercial buildings, offices, hospitals, gyms for educational buildings and buildings for public administration. The system is suitable both to renovation and new buildings. Especially in modernization, it is important that the flexibility meets the requirements of the building. The ceiling cooling system consists of two panel types. One is the comfort panel with heating & cooling pipes, and the other is the so-called passive panel with no pipes. The panels are available in four sizes, in dimensions of 1250x625 mm, 1200x600 mm, 625x625 mm, and 600x600 mm. Inside the Comfort panel the cooled water flows in Uponor PE-X 10 x 1.5 mm flexible pipes, providing even temperature. The blind panel have no pipes, and can be used as part of the suspended ceiling, for example near the walls, or at places where fixing points are necessary, for the connection of lighting, etc. Pieces are connected to each other and the base line by Uponor quick coupling fittings, bushings and jointing reducers. All panels are easy to install on a metal support structure, just like to the structure of the traditional suspended ceiling. The panels are covered by white fibreglass-reinforced fabric that provides a look of the traditional suspended ceilings right after their installation. Therefore full ceiling surface can be used for cooling. Cooling output of Uponor Comfort Panel is up to 92,5 W/m2. However, just like in all other building engineering projects, it is worth designing the system, which can be supported by Uponor.

First Uponor Comfort Panel project in Hungary

0003005

Інформація про проєкт

Інформація про проєкт

Країна
Hungary
Рік завершення будівництва
2012
Тип проєкту
Референс об'єкти
Тип будівлі
Офісні будівлі

Партнери

Партнери

installer
Gépészmester Kft

investor
Hungary Aliment Baromfikereskedelmi Kft

Подібні проєкти

Бізнес центр в Києві

Бізнес центр в Києві

Будівництво нового восьмиповерхового бізнес-центру на М.Вовчка 18а розпочато в 2016 році з метою збільшення площ для здійснення підприємницької діяльності. Будівля має зручне розташування та місцезнаходження та є складовою частиною комплекса, що включає в собі складські площі, логістичний вузол та офісні приміщення.
Day-care centre to be built with energy piles

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
Agder fengsel in Norway

Agder fengsel in Norway

Statsbygg har fått i oppdrag av Justisdepartementet å bygge nytt fengsel i Agder, med avdelinger i Mandal og på Froland. Uponor fikk i oppdrag med å levere gulvvarme til begge fengslene, ca 100 000 meter med rør. Det er lagt gulvvarme i alle  rom på begge prosjektene. Uponor har også levert tappevann; Mandal fengsel med nye PPM fordelere, Froland fengsel messingfordelere. Uponor har også levert noe Ecoflex rør til prosjektene.
The New Deichmanske Library - Bjørvika, Oslo

The New Deichmanske Library - Bjørvika, Oslo

Deichman is equipped with Thermally Active Building System - a system for storing the energy in the concrete ceiling. It is primarily a cooling system, but it can also be used as a heating system. When in cooling mode, no energy is used as the heat is drawn into the concrete, only when it is transferred from the concrete and into the water pipes that are cast in the decking. The need for installed power is reduced, and operating expenses are significantly reduced as opposed to in a air-based cooling system. The TABS is cast into the Prefab elements, which is a BubbleDeck construction with spans up to 10.5 meters.
Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.

New office in Västerås with a focus on modern and environmentally friendly solutions

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
Institut les Mines Telecoms Saclay

Institut les Mines Telecoms Saclay

Le bâtiment d’enseignement supérieur et de recherche pour l’Institut Mines-Télécom intègre un système de dalle active sur une surface de 40 000 m2. Le bâtiment économe en énergie accueillera une gamme variée d’activités propres à l’Institut Mines - Télécom : formations, recherches, transfert et innovation.

City Hall

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.
Magnum Business center

Magnum Business center

MAGNUM – a brand new business centre. One of the largest in Kaunas city in Lithuania.

MAGNUM aims to introduce positive change, an innovative work culture, and a responsible attitude to the environment. It will inspire these aims not only in its residents, but in the city of Kaunas itself — a city that is rapidly growing and changing.

Edificio de oficias en calle Tutor

Edificio de oficias en calle Tutor

The building located at Calle Tutor 16 (Madrid), owned by Arquia Inmuebles, has undergone a complete renovation and modernization, being partially demolished with the façade stabilized. A project designed by Tuñón y Albornoz Arquitectos and executed by SANJOSE Constructora, where the integration of Uponor's Invisible Air Conditioning in the Matrics raised technical floor developed by company Subway Systems.
Ilmalanlinna, Helsinki

Ilmalanlinna, Helsinki

Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.